Skip to main content
VCSManufacturing industries; Metal productionUnited States Registry: RegisteredAM0065

Conversion of SF6 To An Alternative Cover Gas In Magnesium Production In Eaton Rapids, MI and Strathroy, ON

VCS-618 ↗

#21of 115 in United States#406of 629 in Verra (VCS)

5.0/ 10
Integrity
5.0
Transparency
4.5
Claim Safety
5.5
Documentation
5.0

Audit Analysis

This VCS project converts SF6 to Novec as a cover gas in magnesium production, with a solid regulatory additionality test confirmed by the VVB and no reversal risk inherent to the avoidance mechanism. However, the 2025 verification report lists over 30 corrective actions covering transcription errors, missing calibration records, inconsistent monitoring data, and monitoring-plan deficiencies, which significantly undermines confidence in the reported emission reductions. The project is not CORSIA-eligible and the 0% leakage deduction is justified as quantified, but the data-quality issues and project-specific baseline warrant caution.

Red Flags

  • Over 30 corrective actions in the 2025 verification report, including transcription errors across multiple tracking files, missing scale calibration records, duplicate data entries, and misstated activity data for magnesium melted and Novec consumed
  • Primary records of weight measurements for gas cylinders and totes are not available for the entirety of the reporting period, and DNV was unable to cross-verify magnesium invoices against reported melt quantities
  • The monitoring report contains inconsistencies with VCS template requirements, including missing SDG appendix, incorrect monitoring equipment identification, and unexplained inapplicability of Sections 2.2 and 2.3

Credit Vintages

IssuedRetiredAvailable
2008
50,73250,7320
2009
132,143132,1430
2010
199,913199,9130
2011
207,542207,5420
2012
244,098244,0980
2013
265,135265,1350
2014
285,895285,8950
2015
315,296315,2951
2016
318,926318,9260
2017
188,675188,6750
2018
88,50588,5050
2019
131,848131,8480
2020
114,492114,4920
2021
89,54865,00724,541
2022
6,4943,9502,544
Total2,639,2422,612,15627,086

Risk Indicators

Additionality

Regulatory test, VVB-confirmed

Permanence

Avoidance project, no reversals

Leakage

0% deduction, quantified justification

Baseline

Project-specific, reassessed 2018

Safeguards

FPIC and grievance present; benefit sharing not described

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AM0065

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents