CTR Agreste Landfill Gas
GS-4502 ↗ · current registry ID: GS12786
#127of 268 in Biogas#110of 211 in Brazil#1012of 1801 in Gold Standard (GS)#74of 159 in ACM0001
Audit Analysis
The CTR Agreste Landfill Gas project has confirmed additionality and a named VVB, but the verification process surfaced over 28 material findings and 13 corrective actions, including inconsistencies in ER calculations, a questioned MCF value, and unresolved clarification on the passive capture system. The 0% leakage deduction with a 'deemed negligible' justification is inconsistent with an earlier appendix describing leakage as 'quantified,' and the project delivered only ~73% of the pro-rata ex-ante expectation for the elapsed monitoring period. CORSIA eligibility without a stated CCP status introduces dual-channel risk.
Red Flags
- 28+ material findings and 13 corrective actions in the verification report, including ER spreadsheet formula inconsistencies, a questioned MCF value of 1.0, and unresolved clarification on the passive capture system versus the new collection system
- Leakage justification contradicts itself across documents: the 2026 verification report states 'deemed negligible' while a 2025 appendix describes leakage as 'quantified', yet the deduction is 0%
- Crediting period dates differ between the verification report (2023-09-28 to 2028-09-27) and the monitoring report (2023-01-01 to 2027-12-31), creating ambiguity about the actual project duration
- Project delivered approximately 73% of the pro-rata ex-ante expectation for the 18-month monitoring period (90,904 vs ~124,163 expected), suggesting potential over-crediting in the ex-ante estimate or under-performance
- CORSIA-eligible with CCP status not stated, creating dual-channel allocation risk
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 10,745 | 10,000 | 745 | |
| 2024 | 24,673 | 24,000 | 673 | |
| Total | 35,418 | 34,000 | 1,418 |
Risk Indicators
VVB-confirmed combined test; capture not legally required
landfill gas inherent risk
0% deduction; 'deemed negligible' contradicts earlier 'quantified' description
Project-specific modeled baseline; no reassessment date stated
FPIC conducted; grievance mechanism present; safeguards documented
CORSIA-eligible; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →