Curtimade Biogas LLC
#111of 111 in Biogas#107of 115 in United States#24of 32 in Climate Action Reserve (CAR)
Audit Analysis
The available record contains critical evidence gaps across all core dimensions, with virtually no quantified metrics or verification details extracted. Without documented additionality testing, baseline parameters, or leakage treatment, the project cannot be reliably assessed for environmental integrity or claim safety.
Red Flags
- Complete absence of additionality assessment and baseline methodology
- No leakage treatment or buffer pool contribution documented
- CORSIA and CCP eligibility status unreported, leaving double-counting risk unknown
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
No assessment found
Buffer pool absent/unaddressed
No leakage treatment documented
Baseline method not stated
No safeguards documented
Eligibility status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →