Daegu Bangcheon-Ri Landfill Gas CDM Project
#185of 189 in Methane#24of 24 in South Korea#1446of 1459 in CDM (UNFCCC)#158of 159 in ACM0001
Audit Analysis
The Daegu Bangcheon-Ri Landfill Gas CDM project is a heat-generation facility recovering landfill gas in South Korea, validated by KSA in 2021. The validation report identified nine material findings spanning calculation errors, omitted data, and unsupported parameters, all of which required corrective action before registration. While the monitoring plan is technically detailed, significant gaps in additionality documentation, safeguards, and the contradictory leakage treatment limit confidence in the project's environmental integrity.
Red Flags
- Nine material findings in the validation report, including an incorrect GWP value, an unsupported LFG capture efficiency (63.46% vs. corrected 89.1%), omitted power plants in the grid emission factor calculation, and multiple omitted consumption periods — indicating a pattern of calculation and data-quality errors in the PDD.
- Additionality test type and VVB verification of additionality are not stated in the extracted record, while LFG capture is legally required in South Korea, raising the question of whether the project's core activity is truly additional.
- Leakage justification is contradictory: the validation report (May 2021) states leakage is 'deemed negligible' with a 0% deduction, while an appendix (April 2021) describes it as 'quantified' — the two documents disagree on the treatment.
- Safeguards documentation is essentially absent: no FPIC record, no grievance mechanism, no benefit-sharing description, and stakeholder comments are recorded as 'Not received.'
- Total ERR claimed and total ERR verified are identical (1,632,047 tCO₂e), and no monitoring period is stated, making it impossible to verify whether the 'verified' figure reflects an independent measurement or is simply a copy of the ex-ante estimate.
- Gas capture legally mandated — additionality in doubt
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 225,919 | 0 | 225,919 | |
| 2011 | 315,370 | 0 | 315,370 | |
| 2012 | 292,334 | 0 | 292,334 | |
| 2016 | 1,286,671 | 0 | 1,286,671 | |
| 2018 | 736,469 | 0 | 736,469 | |
| 2019 | 245,095 | 0 | 245,095 | |
| 2020 | 272,089 | 0 | 272,089 | |
| 2021 | 266,135 | 0 | 266,135 | |
| 2022 | 100,079 | 0 | 100,079 | |
| Total | 3,740,161 | 0 | 3,740,161 |
Risk Indicators
Test type and VVB confirmation not stated; capture legally r
Gas-consumption project (lower reversal risk)
0% deduction; justification contradicted between documents
Project-specific, modelled; multiple grid-EF corrections app
No FPIC, grievance mechanism, or benefit-sharing documented
CCP and CORSIA status not stated in extracted record
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →