DAEGU & SINANJEUNGDO PV(PHOTOVOLTAIC) POWER PLANT PROJECT
#1096of 1935 in Renewable energy#14of 24 in South Korea#827of 1459 in CDM (UNFCCC)#356of 806 in AMS-I.D
Audit Analysis
A CDM grid-connected solar PV project in South Korea with VVB-confirmed additionality and an appropriate jurisdictional baseline, but plagued by persistent monitoring failures (the Daegu site was entirely discounted to zero), consistent under-delivery of 17–28% below ex-ante estimates, and multiple unresolved corrective actions. The project's integrity is undermined by meter-sharing issues with a non-CDM plant and an outdated 2006 grid emission factor, while the absence of FNRB, usage-rate, and CORSIA/CCP documentation limits confidence in the credit's robustness.
Red Flags
- Daegu PV site emission reductions discounted to 0 tCO2e across multiple monitoring periods due to inability to separate CDM and non-CDM plant output on a shared meter
- Actual emission reductions consistently 17.7–28.1% below ex-ante PDD estimates across multiple monitoring periods, attributed to unaccounted grid imports and climatic variability
- Grid emission factor of 0.6349 tCO2/kWh is sourced from 2006 KEPCO data and has not been updated to reflect South Korea's evolving grid mix
- Multiple corrective actions remain open, including meter replacement, DNA approval letter submission, and PDD form completion
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 853 | 0 | 853 | |
| 2012 | 1,044 | 0 | 1,044 | |
| 2013 | 695 | 0 | 695 | |
| 2014 | 680 | 0 | 680 | |
| 2015 | 626 | 0 | 626 | |
| 2020 | 2,405 | 0 | 2,405 | |
| Total | 6,303 | 0 | 6,303 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversals
0% negligible, justified
Grid EF from 2006, not updated
Mentioned but FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →