The Dak Ne Hydropower Project is a small diversion-type hydro scheme in Vietnam registered under CDM methodology AMS-I.D (v13), with additionality confirmed by TÜV Rheinland Japan via an investment test and a jurisdictional grid-emission-factor baseline. The project shows no reversal events, a reasonable 0% leakage deduction for grid-connected generation, and no outstanding corrective actions. The principal concern is a discrepancy between the first-year claimed emissions reductions (38,296 tCO₂e) and the total project estimate recorded in the issuance document (144,158 tCO₂e), which is most likely a scope difference (per-period vs. lifetime) but warrants clarification.
Red Flags
- ERR figures differ between the monitoring report (38,296 tCO₂e for the first monitoring period) and the issuance document (144,158 tCO₂e, likely the total project estimate); the scope of each figure is not explicitly reconciled in the extracted record.
- Baseline method is described as 'project' in the validation report (2010) but 'jurisdictional' in the monitoring report (2011); while both are consistent with a grid-EF approach, the terminology inconsistency reduces clarity.
- Crediting-period start date differs between the validation report (01 Apr 2010) and the monitoring report (22 Oct 2010), a gap of over six months that is not explained in the available documents.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, justified for grid-connected hydro
Jurisdictional grid EF, minor terminology inconsistency
Safeguards mentioned but FPIC/grievance details not found
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →