Dak Pone Hydropower Project
#1055of 1935 in Renewable energy#50of 80 in Vietnam#782of 1459 in CDM (UNFCCC)#833of 1287 in ACM0002
Audit Analysis
The Dak Pone Hydropower Project is a small-scale CDM hydro project in Vietnam with a VVB-confirmed investment additionality test and a reasonable pro-rata delivery rate (~89% of expectation). However, the absence of a buffer pool, contradictory leakage and baseline characterisations across documents, and 18 material findings (mostly PDD documentation deficiencies) limit confidence in the project's integrity and documentation quality.
Red Flags
- Leakage justification contradicts between the PDD ('deemed negligible') and the monitoring report ('not addressed'), with a 0% deduction in both
- Baseline method is characterised as 'project-specific' in the monitoring report but 'jurisdictional' in the validation report, creating ambiguity about the baseline approach
- 18 material findings and 18 corrective actions required, indicating significant PDD documentation deficiencies at the time of verification
- Total verified ER figure is not found in the extracted record, preventing independent verification of claimed credits
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 21,332 | 0 | 21,332 | |
| 2015 | 63,890 | 0 | 63,890 | |
| 2017 | 53,384 | 0 | 53,384 | |
| 2020 | 133,584 | 0 | 133,584 | |
| 2022 | 67,628 | 0 | 67,628 | |
| Total | 339,818 | 0 | 339,818 |
Risk Indicators
VVB-confirmed investment test
low inherent reversal risk for hydro
0% deduction with contradictory justification across documen
Project-specific baseline; method contradictory between docu
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →