5.8/ 10
Integrity
6.2
Transparency
5.0
Claim Safety
5.5
Documentation
6.8

Audit Analysis

The Dalmia Chini Mills Nigohi biomass energy project (CDM-4608) demonstrates solid additionality through a VVB-confirmed combined test with a clear IRR comparison, and carries no inherent reversal risk as an energy-substitution project. However, the project-specific baseline, a 0% leakage deduction justified only as 'deemed negligible,' and the absence of verified ERR figures and FNRB methodology details limit confidence in the credit quantity. The project was previously rejected by the CDM Executive Board before approval, a historical credibility concern that was resolved.

Red Flags

  • Leakage deduction of 0% with justification limited to 'deemed negligible' — for a biomass energy project where displaced fuel could be used elsewhere, a quantified assessment would be expected
  • Project-specific baseline rather than a jurisdictional or standardized baseline, increasing sensitivity to reference-plant assumptions
  • Total verified ERR figure not found in the extracted record, preventing independent cross-check of claimed credits
  • Project was previously rejected by the CDM Executive Board at EB33 due to name change and baseline issues before eventual approval

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test with IRR analysis

Permanence

Energy substitution — no reversal risk

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, not jurisdictional

Safeguards

Safeguards mentioned but FPIC/grievance not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents