Skip to main content
VCSLivestock, enteric fermentation, and manure managementDenmark Registry: RegisteredAMS-III.D

Danish Crown Methane Destruction Voluntary Carbon Offset Group Project in Denmark (PTB)

VCS-4707 ↗

#148of 189 in Methane#1136of 1339 in Verra (VCS)#83of 105 in AMS-III.D

4.1/ 10
Integrity
4.8
Transparency
3.5
Claim Safety
4.0
Documentation
3.5

Audit Analysis

A VCS-registered methane destruction project in Denmark validated by DNV, with a barrier additionality test and a project-specific modeled baseline. The project type carries inherently low permanence risk since methane is destroyed on-site, but the validation report surfaced 34 material findings and 27 corrective actions, including a ~26% overstatement of lifetime ERR in the PDD relative to the VVB-validated figure, missing FPIC, and no benefit-sharing description. No monitoring reports or verified ERR data are available, and extraction confidence is low, limiting the depth of assessment.

Red Flags

  • PDD claims 105,889 tCO₂e lifetime ERR while the DNV validation report confirms only 84,518 tCO₂e — a ~26% overstatement in the project document
  • 34 material findings and 27 corrective actions identified during validation, including a discrepancy in baseline emissions between the PD and the ER sheet, and a discrepancy in animal numbers between the CHR website and the PD
  • Additionality justification initially relied on an invalid evidence source (a PowerPoint copy) before being corrected
  • No Free, Prior and Informed Consent (FPIC) was conducted and no benefit-sharing arrangement is described
  • No monitoring reports or verified ERR figures are available in the extracted record; the project has been registered since May 2024 with no monitoring period data

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Barrier test VVB-confirmed but initial evidence invalid; PDD contradicts test type

Permanence

On-site methane destruction; no storage or reversal risk

Leakage

0% deduction; negligible for on-site destruction project

Baseline

Project-specific modeled baseline; no reassessment date; not yet due under VCS ALM

Safeguards

Grievance mechanism present; FPIC not conducted; benefit sharing not described

Double-claim

CORSIA and CCP status not stated; double-counting declaration missing

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09AMS-III.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents