Dares Datça Wind Farm Project, Turkey
GS-752 ↗ · current registry ID: GS438
#1011of 1935 in Renewable energy#195of 295 in Turkey#687of 1801 in Gold Standard (GS)#795of 1287 in ACM0002
Audit Analysis
The Dares Datça Wind Farm is a Gold Standard wind project with VVB-confirmed additionality and no inherent reversal risk, but it is undermined by significant contradictions in emission reduction figures across documents, a weak leakage justification, and 23 outstanding corrective actions related to monitoring protocols and reporting accuracy. The project's core design is sound for a wind installation, yet the quality and consistency of its verification and monitoring documentation raise material concerns about data reliability.
Red Flags
- Lifetime ex-ante emission reduction estimate differs by a factor of seven between the PDD (326,991 tCO2) and the monitoring report (46,713 tCO2), creating serious uncertainty about the true credit volume
- 19 Corrective Action Requests and 4 Clarification Requests were issued during verification, including discrepancies between TEIAS grid protocols and project monitoring records for multiple months
- Leakage deduction is 0% with the justification described as 'not addressed' in the most recent (2025) verification report, despite the 2023 report having stated it was 'deemed negligible'
- No new additionality assessment was conducted for the crediting period renewal validation, as noted in the verification report
- Grid emission factor contradicts between the monitoring report (0.6488 tCO2/MWh, 2020) and an appendix (0.7424 tCO2/MWh), a 14% difference that directly affects credit volume
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 2,417 | 2,417 | 0 | |
| 2009 | 46,025 | 46,025 | 0 | |
| 2010 | 50,182 | 50,182 | 0 | |
| 2011 | 43,569 | 43,449 | 120 | |
| 2012 | 17,650 | 7,815 | 9,835 | |
| 2019 | 22,224 | 0 | 22,224 | |
| 2020 | 40,929 | 0 | 40,929 | |
| 2021 | 52,550 | 0 | 52,550 | |
| 2022 | 41,138 | 0 | 41,138 | |
| Total | 316,684 | 149,888 | 166,796 |
Risk Indicators
VVB-confirmed combined test
Wind asset, no reversal risk
0% deduction, justification weak
Project-specific, method contradictory
FPIC, grievance, safeguards documented
CORSIA and CCP status unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →