Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Turkey Registry: RegisteredACM0002

DARICA-1 99 MW Hydro Power Plant Project, Turkey

VCS-506 ↗

#1164of 1935 in Renewable energy#218of 295 in Turkey#780of 1339 in Verra (VCS)#910of 1287 in ACM0002

4.9/ 10
Integrity
5.0
Transparency
4.5
Claim Safety
5.5
Documentation
4.5

Audit Analysis

The DARICA-1 hydro project has a verified additionality assessment and conservative emission reduction figures, but is undermined by the absence of a buffer pool, an unaddressed leakage justification, a baseline method contradiction between documents, and 14 corrective actions that signal significant MRV data-quality issues. The project delivered roughly 83% of its pro-rata expectation for the monitoring period, consistent with the reported 19.7% rainfall-driven production shortfall.

Red Flags

  • Leakage deduction is 0% with the justification recorded as 'not addressed' in the 2022 verification report, while the monitoring report claims it was 'deemed negligible' — an unresolved contradiction
  • 14 corrective actions were raised by the verification team, including inconsistent meter serial numbers, mismatched emission-factor values between the MR and ER sheet, and inaccurate diesel-consumption monitoring
  • The baseline method is recorded as 'project' in the verification report but 'jurisdictional' in the monitoring report, creating ambiguity about the baseline construction
  • The grid emission factor of 0.64 tCO2/MWh is drawn from 2006 data and the baseline was last reassessed in 2008, making the baseline potentially outdated for a project whose crediting period ran to 2019

Credit Vintages

IssuedRetiredAvailable
2009
46,44546,4450
2010
433,404433,4040
2012
170,916170,82294
2013
126,5600126,560
2014
79,78244,91934,863
2015
170,0472,124167,923
2016
197,9300197,930
2017
150,08018,271131,809
2018
152,7050152,705
2019
166,220835165,385
Total1,694,089716,820977,269

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

low inherent reversal risk for hydro

Leakage

0% deduction, justification inconsistent across documents

Baseline

Project-specific baseline; method contradicted; last reassessed 2008

Safeguards

Grievance mechanism present; FPIC status contradictory; partial documentation

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.