DARICA-1 99 MW Hydro Power Plant Project, Turkey
#1164of 1935 in Renewable energy#218of 295 in Turkey#780of 1339 in Verra (VCS)#910of 1287 in ACM0002
Audit Analysis
The DARICA-1 hydro project has a verified additionality assessment and conservative emission reduction figures, but is undermined by the absence of a buffer pool, an unaddressed leakage justification, a baseline method contradiction between documents, and 14 corrective actions that signal significant MRV data-quality issues. The project delivered roughly 83% of its pro-rata expectation for the monitoring period, consistent with the reported 19.7% rainfall-driven production shortfall.
Red Flags
- Leakage deduction is 0% with the justification recorded as 'not addressed' in the 2022 verification report, while the monitoring report claims it was 'deemed negligible' — an unresolved contradiction
- 14 corrective actions were raised by the verification team, including inconsistent meter serial numbers, mismatched emission-factor values between the MR and ER sheet, and inaccurate diesel-consumption monitoring
- The baseline method is recorded as 'project' in the verification report but 'jurisdictional' in the monitoring report, creating ambiguity about the baseline construction
- The grid emission factor of 0.64 tCO2/MWh is drawn from 2006 data and the baseline was last reassessed in 2008, making the baseline potentially outdated for a project whose crediting period ran to 2019
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 46,445 | 46,445 | 0 | |
| 2010 | 433,404 | 433,404 | 0 | |
| 2012 | 170,916 | 170,822 | 94 | |
| 2013 | 126,560 | 0 | 126,560 | |
| 2014 | 79,782 | 44,919 | 34,863 | |
| 2015 | 170,047 | 2,124 | 167,923 | |
| 2016 | 197,930 | 0 | 197,930 | |
| 2017 | 150,080 | 18,271 | 131,809 | |
| 2018 | 152,705 | 0 | 152,705 | |
| 2019 | 166,220 | 835 | 165,385 | |
| Total | 1,694,089 | 716,820 | 977,269 |
Risk Indicators
VVB-confirmed barrier test
low inherent reversal risk for hydro
0% deduction, justification inconsistent across documents
Project-specific baseline; method contradicted; last reassessed 2008
Grievance mechanism present; FPIC status contradictory; partial documentation
Not CORSIA-eligible; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →