Skip to main content
CDMWindChinaACM0002

Datang Chifeng Bolike II Wind Power Project

CDM-3105 ↗

#607of 1935 in Renewable energy#285of 1084 in China#413of 1459 in CDM (UNFCCC)#465of 1287 in ACM0002

5.6/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
6.5
Documentation
5.5

Audit Analysis

A CDM wind power project in China using a jurisdictional grid-emission-factor baseline (0.9139 tCO2/MWh, 2017) with a 7-year crediting period. The verified emissions reduction of 114,330 tCO2e matches the pro-rata expectation from the PDD's lifetime estimate of 800,310 tCO2e, indicating consistent delivery. Key gaps include the absence of an explicitly stated additionality test type, missing monitoring period details, and incomplete safeguards documentation.

Red Flags

  • Additionality test type and VVB confirmation are not stated in the extracted record, leaving the additionality assessment unverified in available documents
  • Safeguards are mentioned in the PDD but absent from the validation report, creating an inconsistency in the project's social compliance documentation
  • No monitoring report or verification report appears in the extracted document set, limiting confidence in ongoing MRV performance

Credit Vintages

IssuedRetiredAvailable
2012
324,6020324,602
Total324,6020324,602

Risk Indicators

Additionality

Test type not stated in available documents

Permanence

Avoidance project; no reversal risk

Leakage

Deemed negligible; appropriate for wind

Baseline

Jurisdictional grid EF; reassessed 2019

Safeguards

PDD mentions; VVB report silent; FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-28ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents