Datang Delingha Renewable Power Co., Ltd. Delingha 10MW Grid-connected Photovoltaic Power Project
#488of 1935 in Renewable energy#196of 1084 in China#319of 1459 in CDM (UNFCCC)#172of 806 in AMS-I.D
Audit Analysis
A straightforward 10 MW grid-connected solar PV project under the CDM registry with a jurisdictional baseline and consistent claimed/verified emission reductions of 99,827 tCO₂e over a 7-year crediting period. The main weakness is that additionality assessment details were not captured in the extracted record despite a validation report being present, and no buffer pool or permanence mechanism is documented. Two minor administrative corrective actions were identified and resolved, and no contradictions exist between documents.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record; the validation report is listed as a source but the specific additionality methodology (investment, regulatory, or barrier test) could not be confirmed.
- No buffer pool or permanence safeguard is documented; while reversal risk is low for a physical solar asset, the absence of any permanence mechanism is a gap under CDM rules.
- The monitoring report is dated 2019-11-26 yet covers a 7-year period through 2026-07-31, raising a question about whether this is a full-period ex-ante verification or a first-period report mislabeled.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Validation report present but additionality test type not co
low inherent reversal risk for so
0% deduction with 'deemed negligible' justification; appropr
Jurisdictional baseline, grid EF 0.7674 (2019), reassessed 2
Safeguards and benefit-sharing mentioned; FPIC and grievance
CDM Phase II credits structurally excluded from CORSIA/CCP,
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →