Datang Duolun Daxishan phase III Wind Farm project

CDM-4093 ↗

#1561of 1935 in Renewable energy#1009of 1084 in China#1353of 1459 in CDM (UNFCCC)#1185of 1287 in ACM0002

4.0/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
3.5
Documentation
3.5

Audit Analysis

A CDM wind farm project with a jurisdictional baseline and appropriate leakage treatment, but significant data gaps in additionality documentation and a major discrepancy between the PDD and validation report on total claimed emissions reductions (687,855 vs 98,265 tCO₂e). No monitoring or verification data is available to confirm actual delivery, and the low extraction confidence further limits confidence in the extracted record.

Red Flags

  • Total ERR claimed differs by a factor of ~7 between the PDD (687,855 tCO₂e) and the validation report (98,265 tCO₂e), raising serious questions about the accuracy of the project's credit volume
  • Grid emission factor contradicts between documents (0.84045 in the validation report vs 0.968 in an unidentified source), with the lower value from an undated, unnamed document
  • No monitoring or verification report is available in the extracted record, so actual credit delivery cannot be assessed
  • Additionality test type and VVB confirmation are not captured in the available documents, leaving a gap in the additionality evidence chain

Credit Vintages

IssuedRetiredAvailable
2012
59,785059,785
2013
126,7610126,761
Total186,5460186,546

Risk Indicators

Additionality

Test type not captured in extracted record

Permanence

Avoidance mechanism, no reversal risk

Leakage

0% with 'deemed negligible' justification

Baseline

Jurisdictional, reassessed 2019

Safeguards

Mentioned and benefit sharing described, but FPIC and grieva

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-28ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents