Datang Haipai Donggang Wind Power Project
#1099of 1935 in Renewable energy#612of 1084 in China#830of 1459 in CDM (UNFCCC)#857of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a jurisdictional baseline and VVB-confirmed additionality, but the available record is limited to the validation report and PDD with no monitoring data, no verified ERR figures, and a flagged discrepancy in the claimed emissions reductions between the two documents. The project is mid-crediting period (2019–2026) yet no periodic monitoring or verification reports are present, leaving the actual delivery of credits unconfirmed.
Red Flags
- No monitoring reports or verified ERR figures are present in the extracted record despite the project being in its crediting period since March 2019
- Discrepancy in total ERR between the PDD (626,675 tCO₂e) and the validation report (89,525 tCO₂e) — likely an annual-vs-lifetime basis difference, but not explicitly reconciled in the documents
- No buffer pool or permanence mechanism is stated for the project, and no reversal-event data is available
- One of the four source documents is listed as 'unknown', reducing confidence in the completeness of the evidence base
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 28,035 | 0 | 28,035 | |
| Total | 28,035 | 0 | 28,035 |
Risk Indicators
VVB-confirmed
mixed evidence / unresolved risk
0% deemed negligible, consistent with wind
Jurisdictional grid EF, reassessed 2019
Mentioned but no FPIC or grievance detail
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →