Datang Huayin Nanshan Wind Power Project
#836of 1935 in Renewable energy#426of 1084 in China#587of 1459 in CDM (UNFCCC)#648of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a jurisdictional baseline and appropriate leakage treatment, validated by CCSC. The main weaknesses are the absence of explicit additionality documentation in the extracted record, two administrative corrective actions, and limited monitoring data. The ERR contradiction between the PDD and validation report is explainable by different time bases (full crediting period vs. first monitoring period).
Red Flags
- Additionality test type and VVB verification status are not explicitly stated in the extracted record, creating an evidence gap for a mandatory CDM requirement
- Two corrective actions were raised in the validation report: the PDD did not use the latest form version and not all monitoring parameters were included in the monitoring plan
- No monitoring report or monitoring period data is available in the extracted record, limiting verification of actual performance
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test type not explicitly stated in record
Avoidance project, no reversal risk
0% with negligible justification, appropriate for wind
Jurisdictional, reassessed 2019
Mentioned and benefit sharing described, but FPIC/grievance
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →