Datang Jia County Yunyang Wind Farm Project
#354of 1935 in Renewable energy#133of 1084 in China#225of 1459 in CDM (UNFCCC)#262of 1287 in ACM0002
Audit Analysis
A CDM wind project with a jurisdictional baseline, VVB-confirmed additionality, and no material findings. The apparent ERR discrepancy between the PDD and validation report is explained by different reporting bases (lifetime vs. single-year), and the 0% leakage deduction is reasonable for a wind displacement project. However, the absence of monitoring reports, unspecified additionality test type, and missing safeguards detail limit confidence.
Red Flags
- No monitoring reports found in the extracted record; the monitoring period is not stated, making it impossible to verify actual delivery against the claimed 50,881 tCO2e
- Additionality test type is not specified in the validation report, limiting the ability to assess the robustness of the additionality claim
- FPIC and grievance mechanism are not documented in the available records, leaving safeguards compliance unverified
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed
Avoidance project, low reversal risk
0% justified as negligible for wind
Jurisdictional, 2017 grid EF
Mentioned but FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →