Skip to main content
CDMWindChinaACM0002

Datang Jiaonan Liuwang Phase I Wind Farm Project

CDM-6044 ↗

#355of 1935 in Renewable energy#134of 1084 in China#226of 1459 in CDM (UNFCCC)#263of 1287 in ACM0002

6.0/ 10
Integrity
5.8
Transparency
5.8
Claim Safety
6.8
Documentation
5.2

Audit Analysis

A CDM wind energy project in China using the well-established ACM0002 methodology with a jurisdictional baseline and VVB-confirmed additionality. The project is fundamentally sound for its sector, but documentation is limited to the PDD and validation report with no monitoring or verification report available, and safeguards documentation (FPIC, grievance mechanism) is absent from the extracted record.

Red Flags

  • No monitoring or verification report present in the evidence set; only the PDD and validation report are available
  • One of the four evidence documents is unidentified ('unknown'), reducing confidence in the completeness of the record
  • No FPIC or grievance mechanism documented despite safeguards being mentioned
  • No buffer pool or permanence risk mitigation documented, though reversal risk is inherently low for a wind avoidance project

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed

Permanence

Avoidance project, low reversal risk

Leakage

0% deemed negligible, sector-appropriate

Baseline

Jurisdictional, reassessed 2019

Safeguards

Mentioned but FPIC and grievance mechanism absent

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-28ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents