Datang Jiaonan Liuwang Phase II Wind Power Project
#302of 1935 in Renewable energy#110of 1084 in China#190of 1459 in CDM (UNFCCC)#223of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China using the well-established ACM0002 methodology with a jurisdictional grid-emission-factor baseline and VVB-confirmed additionality. The primary concern is a significant discrepancy between the PDD's ex-ante estimate (556,479 tCO₂e) and the validation report's figure (79,497 tCO₂e), likely reflecting different time horizons but creating transparency risk. Leakage treatment and permanence are appropriate for an avoidance-type wind project.
Red Flags
- PDD (556,479 tCO₂e) and validation report (79,497 tCO₂e) report materially different ERR figures; the basis for the difference (crediting period length vs. full project lifetime) is not explicitly reconciled in the extracted documents
- No buffer pool or permanence mechanism documented, and no reversal events data available — permanence risk is unquantified
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed (CCSC)
Avoidance project
0% deemed negligible — appropriate for wind
Jurisdictional grid EF (0.8404, 2019)
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →