Datang Jilin Shuangliao Wind Farm Project

CDM-0869 ↗

#1100of 1935 in Renewable energy#613of 1084 in China#831of 1459 in CDM (UNFCCC)#858of 1287 in ACM0002

5.0/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
5.5
Documentation
5.5

Audit Analysis

A CDM wind energy project in China with a jurisdictional baseline and a 0% leakage deduction deemed negligible, which is reasonable for grid-connected wind. However, the additionality test type and VVB confirmation are not stated in the extracted record, and a significant discrepancy exists between the PDD's ex-ante estimate (658,973 tCO₂e) and the validated/verified figure (94,139 tCO₂e), raising questions about the robustness of the original claim. A minor corrective action was raised regarding incomplete monitoring parameters in the PDD.

Red Flags

  • Additionality test type and VVB confirmation are not stated in any extracted document, leaving the core CDM additionality requirement unverified in the available record
  • The PDD (v7, 2019-05-24) reports an ex-ante estimate of 658,973 tCO₂e while the validation report (2019-05-30) and monitoring report both report 94,139 tCO₂e — a factor-of-7 discrepancy that is not explained in the available documents
  • No buffer pool percentage is stated, leaving permanence risk unquantified despite the absence of a reversal mechanism
  • A corrective action (CAR-1) was raised because not all monitoring parameters were included in the PDD's monitoring plan, indicating a documentation gap at validation

Credit Vintages

IssuedRetiredAvailable
2008
79,172079,172
2009
103,0640103,064
2010
101,1470101,147
2012
168,9560168,956
Total452,3390452,339

Risk Indicators

Additionality

Test type and VVB confirmation not stated in extracted recor

Permanence

no reversal events but risk unquantif

Leakage

0% deduction, deemed negligible — appropriate for grid-conne

Baseline

Jurisdictional baseline, 2019 grid EF, reassessed 2019

Safeguards

Safeguards and benefit-sharing mentioned; FPIC and grievance

Double-claim

CCP and CORSIA status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-28ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.