Skip to main content
CDMWindChinaACM0002

Datang Ningxia Ningdong (Baitugang Town Leshuigou) Wind Farm Project

CDM-6084 ↗

#1358of 1935 in Renewable energy#822of 1084 in China#1088of 1459 in CDM (UNFCCC)#1049of 1287 in ACM0002

4.6/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

A CDM wind farm project in China with a jurisdictional grid-emission-factor baseline and a VVB-validated design, but the extracted record contains a seven-fold discrepancy between the PDD and validation report on total emissions reductions, and several key additionality and monitoring details are absent from the available documents. The project is structurally sound for a wind avoidance credit, yet the data gaps and contradiction limit confidence in the claimed figures.

Red Flags

  • Seven-fold discrepancy in total ERR: the PDD (June 2019) reports 528,045 tCO₂e while the validation report (October 2019) reports 75,435 tCO₂e; the basis for the difference is not explained in the extracted record.
  • Additionality test type and VVB confirmation are not captured in the extracted data, leaving the core CDM additionality requirement unverified in the available evidence.
  • No monitoring report or monitoring period is present in the evidence set, so actual performance against the ex-ante estimate cannot be assessed.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Test type not captured; VVB report exists with no findings

Permanence

Avoidance project; no reversal risk

Leakage

0% deemed negligible; reasonable for grid wind

Baseline

Jurisdictional grid EF; standard for CDM wind

Safeguards

Safeguards and benefit sharing mentioned; no FPIC or grievan

Double-claim

CORSIA and CCP status not stated; dual-channel risk unassess

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-28ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents