Datang Qingyuan Phase II Wind Power Project
#303of 1935 in Renewable energy#111of 1084 in China#191of 1459 in CDM (UNFCCC)#224of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a jurisdictional baseline, VVB-confirmed additionality, and no material findings. The project is low-risk in terms of over-crediting given the well-established ACM0002 methodology and avoidance-based nature of wind generation. Key gaps include the absence of a monitoring report in the extracted record, unspecified additionality test type, and unconfirmed CORSIA/CCP status.
Red Flags
- The PDD (June 2019) reports a total ERR of 357,917 while the validation report (September 2019) reports 51,131 — a 7:1 ratio matching the 7-year crediting period, suggesting different reporting bases but creating documentation ambiguity
- No monitoring report was found in the extracted record, leaving the actual verification of emissions reductions unconfirmed beyond the validation-stage estimate
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 21,953 | 0 | 21,953 | |
| Total | 21,953 | 0 | 21,953 |
Risk Indicators
VVB-confirmed, test type unspecified
Avoidance project, no reversal risk
0% justified as negligible (wind)
Jurisdictional, reassessed 2019
Mentioned, benefit sharing described, no FPIC/grievance deta
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →