Datang Yanan Renewable Power Co., Ltd. Ansai Wangjiawan Wind Farm Project
#1417of 1935 in Renewable energy#869of 1084 in China#1152of 1459 in CDM (UNFCCC)#1090of 1287 in ACM0002
Audit Analysis
A CDM wind farm project in China validated in 2019 with a jurisdictional grid baseline and negligible leakage, but the available record is limited to the PDD and validation report with no monitoring or verification data. A significant seven-fold discrepancy between the PDD (486,514 tCO2e) and the validation report (69,502 tCO2e) raises material concerns about the accuracy of the ex-ante estimate, and key MRV parameters remain unconfirmed in the extracted record.
Red Flags
- Seven-fold discrepancy in ex-ante emissions reduction: the PDD (2019-07-23) states 486,514 tCO2e while the validation report (2019-07-25) states 69,502 tCO2e; the validation report figure is privileged as the VVB's authoritative assessment, but the magnitude of the gap warrants scrutiny of which figure was used for credit issuance
- No monitoring report or verification report is present in the extracted record despite the project being mid-crediting period (2019–2026), and the verified ERR figure is identical to the claimed figure, suggesting no independent monitoring verification has been documented
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving the additionality basis unconfirmed despite the project having been validated
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Validated but test type unconfirmed in record
Avoidance project, no reversal risk
Negligible, consistent with grid-connected wind
Jurisdictional grid EF, 2019 reassessment
Mentioned but FPIC and grievance mechanism unconfirmed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →