Des Moines Forest Carbon Offsets
#52of 389 in United States#23of 59 in City Forest Credits (CFC)
Audit Analysis
The Des Moines urban forest project demonstrates solid additionality (VVB-confirmed combined test) and a jurisdictional baseline, with the project delivering roughly 192% of its pro-rata carbon expectation over the first four-year monitoring period. However, leakage treatment is entirely absent from the available documents, reversal risk is not explicitly assessed by the verifier, and the 5% buffer pool is modest for a 26-year crediting period. Several eligibility and MRV fields (CORSIA, CCP, FNRB) remain unstated, limiting full confidence in claim safety.
Red Flags
- Leakage deduction is not stated in any available document despite this being a tree-planting project where displacement of existing vegetation or community land-use changes is a plausible risk
- Reversal risk is not explicitly assessed in the verification report; the 5% buffer pool is present but the verifier did not discuss specific reversal scenarios or mortality risk beyond confirming the 20% estimated mortality rate was met
- Contradiction in ERR figures between the validation report (1,391 tCO₂e lifetime) and the verification report (413 tCO₂e for the monitoring period) — explainable as lifetime vs. period basis, but the merged record initially conflated the two
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 157 | 0 | 157 | |
| 2023 | 560 | 0 | 560 | |
| 2025 | 413 | 0 | 413 | |
| Total | 1,130 | 0 | 1,130 |
Risk Indicators
VVB-confirmed combined test
reversal risk not explicitly assessed
No leakage deduction or justification stated
Jurisdictional method; reassessment timing not stated
Safeguards and benefit sharing mentioned; FPIC and grievance mechanism not stated
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →