Vai al contenuto principale
VCS Energy demand India Registry: Registered Documentazione completa General Methodology v2.0

Distribution of Improved cook stove - Phase 10

VCS-2438 ↗

6.5 / 10
Integrity
6.2
Transparency
6.8
Claim Safety
6.0
Documentation
7.4

Score Breakdown

Integrity

verified Additionality is confirmed by the VVB (monitoring report, 2022-08-26).

missing Leakage is said to be quantified but the leakage deduction value is not found in the extracted record (monitoring report, 2022-08-26).

Transparency

verified Monitoring period is clearly stated (2012-11-20 — 2017-11-19) and a verified ER total is provided (58,939) (monitoring report, 2022-08-26).

missing Usage performance metrics (assumed and verified usage rates) are not found in the extracted record, limiting MRV transparency for a cookstove program (monitoring report, 2022-08-26).

Claim Safety

verified The project is not CORSIA-eligible, reducing some downstream claim and eligibility-related risks (registry extract).

missing Over-crediting risk remains because leakage and usage-rate parameters are not clearly evidenced in the extracted record (monitoring report, 2022-08-26).

Documentation

verified Multiple core documents are present (PDD, validation report, monitoring report, issuance) and extraction confidence is high (evidence list; extracted record).

missing Contradictions between validation and monitoring documents on safeguards-related items reduce confidence in narrative consistency (validation report 2022-02-26 vs monitoring report 2022-08-26).

Detailed Analysis

Integrity

The monitoring report (2022-08-26) indicates additionality was confirmed by the VVB, and it reports no material findings and no corrective actions required, which supports procedural integrity. However, the baseline is project-specific and the timing of any baseline reassessment is not stated in available documents, which weakens robustness over a long crediting period (2012-11-20 — 2022-11-19). Leakage is described as “quantified” in the monitoring report (2022-08-26), but the actual leakage deduction percentage is not found in the extracted record, leaving a material integrity gap for cookstove crediting.

Transparency

The monitoring report (2022-08-26) clearly states the monitoring period (2012-11-20 — 2017-11-19) and provides a verified emissions reduction total of 58,939. The VVB is identified as TÜV SÜD South Asia Pvt Ltd, which supports audit traceability. However, the extracted record does not include total ERs claimed, nor does it include assumed or verified usage rates, despite the report stating an annual survey monitoring approach; this limits the ability to independently assess MRV strength from the extracted facts.

Claim Safety

The project is explicitly not CORSIA-eligible, which reduces certain eligibility-driven marketing and double-claim concerns. Still, claim safety is constrained by missing key drivers of cookstove quantification in the extracted record—especially usage rates and the explicit leakage deduction—raising residual over-crediting/greenwashing risk if public claims are made without these details. CCP status is not stated in available documents, leaving uncertainty about alignment with higher-integrity labels.

Documentation

The extracted record indicates a strong document set (PDD, validation report, monitoring report, issuance) with 12 documents used and high extraction confidence, which supports completeness. The monitoring report is relatively recent (2022-08-26) and includes the monitoring period and verified ERs. However, multiple safeguards-related elements are inconsistent between the validation report (2022-02-26) and monitoring report (2022-08-26), which reduces confidence in documentation consistency even if later documents contain more detail.

Overall

Overall scoring is pulled down mainly by quantification gaps (leakage deduction value and usage-rate evidence not found in the extracted record) and by safeguards contradictions across documents. For the contradictions, the monitoring report (2022-08-26) is privileged over the validation report (2022-02-26) because it is more recent and typically reflects implemented procedures during monitoring; however, the presence of these discrepancies itself indicates reliability risk and warrants a downward adjustment. The project benefits from VVB-confirmed additionality and a clear verified ER figure, but the missing parameters and inconsistencies increase over-crediting and reputational risk.

Audit Analysis

This VCS cookstove project has a solid procedural backbone (VVB involvement, no reported material findings, and a defined monitoring period), but key quantification elements that drive credit integrity—especially leakage deduction and usage performance—are not clearly evidenced in the extracted record. Safeguards-related statements also conflict between the validation and monitoring documents, which increases reliability and reputational risk.

Project Description

Proponent: G K Energy Marketers Pvt. Ltd Protocol categories: Energy demand Protocols: AMS-II.G. Estimated annual GHG reductions: 12619 tCO2e Region: Asia Registration date: 2022-09-30

Red Flags

  • Leakage is described as “quantified” but the actual leakage deduction percentage is not found in the extracted record, creating over-crediting risk.
  • Key safeguards items (FPIC, grievance mechanism, benefit sharing, safeguards mention) conflict between the validation report (2022-02-26) and monitoring report (2022-08-26).
  • Usage rate (assumed and verified) is not found in the extracted record despite cookstove ERs being highly sensitive to sustained use.

Credit Vintages Exhausted

Issued Retired Available
2012
12,471 12,471 0
2013
12,109 12,109 0
2014
11,929 11,929 0
2015
11,548 11,548 0
2016
10,638 10,638 0
Total 58,695 58,695 0

Cosa migliorerebbe questo punteggio

  • Disclose and clearly evidence the leakage deduction percentage and its calculation (including inputs and uncertainty) in the monitoring/verification package.
  • Provide explicit assumed and verified usage-rate results (survey design, sample size, stove stacking treatment, and any discounting) for the monitoring period.
  • Resolve safeguards inconsistencies by aligning the validation and monitoring narratives (or issuing an addendum) documenting FPIC, grievance mechanism operation, and benefit-sharing implementation with dates and evidence.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

Non-reversal project type

Leakage

Quantified but deduction not evidenced

Baseline

Project-specific baseline; reassessment unclear

Safeguards

Safeguards claimed but inconsistent across docs

Double-claim

Not CORSIA-eligible; CCP status unclear

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-07 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti