Distribution of Improved cook stove - Phase 14
Score Breakdown
Integrity
verified The validation/verification record indicates additionality was confirmed by the VVB, and the monitoring report reports no material findings or corrective actions.
missing Baseline method, leakage deduction percentage, and usage-rate parameters are not found in the extracted record, weakening confidence in quantified emission reductions.
Transparency
verified The monitoring period (2012-10-04 to 2017-10-03) and VVB (TÜV SÜD South Asia Pvt Ltd) are identified, and multiple document types are available (PDD, validation, monitoring, issuance).
missing Total ERR claimed is not found in the extracted record, and key MRV parameters (usage-rate values, leakage deduction value, baseline method) are missing.
Claim Safety
verified The monitoring report provides a verified ER figure (61,559) and indicates quantified leakage treatment, which can reduce over-crediting risk when consistently applied.
missing CORSIA eligibility and CCP status are not found in the extracted record, and inconsistencies between PDD and monitoring on leakage treatment increase greenwashing/over-crediting risk.
Documentation
verified Document coverage appears broad (11 documents used including PDD, validation report, monitoring report, and issuance) with high extraction confidence.
missing Contradictions between core documents (crediting period dates; leakage treatment) indicate documentation reliability issues.
Detailed Analysis
Integrity
The monitoring record indicates additionality was confirmed by the VVB (validation/verification documentation referenced in the extracted record), and the monitoring report (2022-08-16) reports no material findings and no corrective actions. However, the baseline approach and the timing of any baseline reassessment are not found in the extracted record, which weakens confidence in the counterfactual. Leakage is said to be quantified in the monitoring report, but the leakage deduction percentage itself is not found in the extracted record, limiting the ability to judge whether leakage was conservatively treated.
Transparency
The monitoring report (2022-08-16) clearly states the monitoring period (2012-10-04 to 2017-10-03) and identifies the VVB as TÜV SÜD South Asia Pvt Ltd. The extracted record shows multiple document types are available (PDD, validation report, monitoring report, issuance), supporting traceability. Still, the total emission reductions claimed are not found in the extracted record (only the verified total of 61,559 is provided), and key MRV inputs such as usage-rate assumed/verified values and the baseline method are missing.
Claim Safety
Over-crediting risk remains moderate because the baseline method is not found in the extracted record and usage-rate assumed/verified values are also not found, even though the monitoring approach is described as annual surveys in the monitoring report (2022-08-16). Leakage treatment is a particular concern: the monitoring report describes leakage as quantified, but the PDD indicates it was not addressed, raising the risk that leakage controls were not consistently applied. CORSIA eligibility and CCP status are not found in the extracted record, so buyers cannot easily assess downstream claim constraints from the extracted data alone.
Documentation
Documentation coverage is relatively strong: the extracted record lists 11 documents used and includes core types (PDD, validation report, monitoring report, issuance), with high extraction confidence. The monitoring report is dated 2022-08-16, which is reasonably recent relative to the crediting period. However, contradictions between the PDD and monitoring report on leakage treatment and between documents on the crediting period dates reduce confidence in document consistency and version control.
Overall
Overall quality is mid-range: additionality is VVB-confirmed and the monitoring report shows no material findings or corrective actions, supporting credibility. Two contradictions materially affect confidence: (1) leakage is “quantified” in the monitoring report (2022-08-16) but “not addressed” in the PDD (dated 2022-08-16 in the extracted contradiction list), so the monitoring report is privileged as the more operational MRV document, but the inconsistency still lowers scores due to reliability concerns; (2) the crediting period differs between the monitoring report (2012-10-04 to 2022-10-03) and the PDD (2012-12-30 to 2022-12-29, dated 2021-01-14), and the monitoring report dates are privileged as the more recent/implementation-aligned statement, while noting the discrepancy suggests document control issues. Key missing quantifications (baseline method, leakage deduction value, usage-rate values, and ERR claimed) keep integrity and claim-safety from scoring higher.
Audit Analysis
This VCS cookstove project shows decent procedural integrity: additionality is confirmed by the VVB and the monitoring record reports no material findings or corrective actions. However, key quantifications that affect crediting robustness (baseline approach, leakage deduction value, and usage-rate assumptions/verification) are not found in the extracted record, and there are document inconsistencies that reduce confidence.
Project Description
Proponent: G K Energy Marketers Pvt. Ltd Protocol categories: Energy demand Protocols: AMS-II.G. Estimated annual GHG reductions: 13050 tCO2e Region: Asia Registration date: 2022-12-07
Red Flags
- Baseline approach and reassessment timing are not found in the extracted record, limiting confidence in the counterfactual and over-crediting risk controls.
- Leakage is described as “quantified” in the monitoring report but “not addressed” in the PDD, indicating inconsistent treatment across core documents.
- Usage-rate assumed and usage-rate verified values are not found in the extracted record despite annual survey monitoring being referenced.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 10,939 | 0 | 10,939 | |
| 2013 | 13,259 | 0 | 13,259 | |
| 2014 | 12,807 | 0 | 12,807 | |
| 2015 | 12,379 | 0 | 12,379 | |
| 2016 | 12,175 | 0 | 12,175 | |
| Total | 61,559 | 0 | 61,559 |
Cosa migliorerebbe questo punteggio
- Disclose and clearly reference the baseline approach (and any reassessment) and provide the total ERR claimed alongside the verified total for the monitoring period.
- Provide explicit leakage deduction percentage and the quantified leakage calculation, and reconcile the PDD vs monitoring inconsistency with a controlled document revision trail.
- Report usage-rate assumed and usage-rate verified values (with survey design, sample size, and uncertainty treatment) to strengthen MRV credibility for cookstove performance.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
Non-reversal project type; no reversals reported
Leakage inconsistently treated across documents
Baseline approach not found in extracted record
FPIC and grievance mechanism documented
CORSIA/CCP status not found in extracted record
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →