Distribution of Improved cook stove - Phase 18

VCS-2439 ↗

5.9 / 10
Integrity
5.2
Transparency
6.0
Claim Safety
5.8
Documentation
7.4

Score Breakdown

Integrity

verified The monitoring/verification record indicates additionality was confirmed by the VVB (monitoring report, 2022).

missing Baseline method and leakage deduction value were not found in the extracted record, weakening over-crediting controls.

Transparency

verified Monitoring period and monitoring approach are specified, with usage monitored via annual surveys (monitoring report, 2022).

missing Total ERs claimed vs verified were not found in the extracted record, limiting third-party reproducibility.

Claim Safety

verified The project is explicitly not CORSIA-eligible, reducing certain downstream claim risks (merged record).

missing Missing baseline and leakage deduction values increase over-crediting/greenwashing risk for cookstove crediting.

Documentation

verified Multiple document types are present (PDD, validation report, monitoring report, issuance) and extraction confidence is high (merged record).

missing Contradictions between validation and monitoring reports on safeguards-related items reduce confidence in document consistency.

Detailed Analysis

Integrity

The monitoring report (2022) indicates additionality was confirmed by the VVB, which supports additionality robustness. However, the baseline approach is not stated in the extracted record (despite the AMS II-G methodology being identified), and the timing of any baseline reassessment is also not found. Leakage is described as “quantified” (monitoring report, 2022), but the actual leakage deduction percentage is not found in the extracted record, which weakens confidence in net ER integrity.

Transparency

The monitoring period is clearly stated as 2012-10-06 to 2017-10-05, and the monitoring approach includes annual survey-based usage monitoring (monitoring report, 2022). The VVB is identified as TÜV SÜD South Asia Pvt Ltd (monitoring report, 2022), supporting traceability of assurance. However, total emission reductions claimed and total emission reductions verified are not found in the extracted record, limiting the ability to reconcile issuance with monitored performance.

Claim Safety

The project is explicitly not CORSIA-eligible, which reduces the risk of CORSIA-related claim misuse (merged record). CCP status is not found in the extracted record, so voluntary-claims alignment cannot be confirmed. Over-crediting risk remains moderate because the baseline method and leakage deduction value are not found in the extracted record, even though leakage is said to be quantified (monitoring report, 2022).

Documentation

The extracted record shows a reasonably complete document set (PDD, validation report, monitoring report, issuance) with 12 documents used and high extraction confidence, which supports documentation quality. No material findings or corrective actions are reported in the extracted record, which is directionally positive for audit outcomes. Nonetheless, multiple safeguards-related contradictions between the validation report (2022) and monitoring report (2022) reduce confidence in consistency and completeness of social safeguard documentation.

Overall

Overall quality is constrained by missing core quantification fields (baseline method, leakage deduction percentage, and ER claimed/verified totals) and by internal inconsistencies across documents. For safeguards, the monitoring report (2022-12-13) states safeguards were mentioned, FPIC was conducted, and grievance/benefit-sharing provisions exist, while the validation report (2022-05-23) indicates the opposite; I privilege the more recent monitoring report as it reflects implemented procedures during/after monitoring, but I still downgrade scores due to the contradiction itself. For the crediting period, the monitoring report (2012-10-06—2022-10-05) conflicts with the PDD (2012-12-31—2022-12-30); I privilege the monitoring report as the later operational document tied to monitored implementation, but the discrepancy signals recordkeeping risk and slightly lowers transparency/documentation.

Audit Analysis

This is a VCS cookstove distribution project with VVB-confirmed additionality and a defined monitoring period, but several core quantification elements (baseline approach, leakage deduction, and verified ERs) were not found in the extracted record. Safeguards and stakeholder provisions appear in the monitoring report but are contradicted by the validation report, which raises reliability concerns.

Project Description

Proponent: G K Energy Marketers Pvt. Ltd Protocol categories: Energy demand Protocols: AMS-II.G. Estimated annual GHG reductions: 12945 tCO2e Region: Asia Registration date: 2023-01-03

Red Flags

  • Baseline approach and baseline reassessment timing were not found in the extracted record, limiting confidence in the counterfactual.
  • Leakage is described as “quantified” but the actual leakage deduction percentage was not found in the extracted record.
  • Key safeguards fields (FPIC, grievance mechanism, benefit sharing, safeguards mention) contradict between the validation report and monitoring report.
  • Total emission reductions claimed and verified were not found in the extracted record, reducing auditability of outcomes.

Credit Vintages

Issued Retired Available
2012
10,810 10 10,800
2013
13,204 0 13,204
2014
12,958 12,958 0
2015
12,570 0 12,570
2016
11,636 0 11,636
Total 61,178 12,968 48,210

Cosa migliorerebbe questo punteggio

  • Disclose the baseline calculation approach and parameters used under AMS II-G (including any reassessment) and provide a clear baseline justification in the monitoring/verification package.
  • Publish a clear leakage deduction value (percentage) with the underlying calculation and include a reconciliation table showing ER claimed vs ER verified vs issued for the monitoring period.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

Non-reversal project type

Leakage

Quantified but deduction not evidenced

Baseline

Baseline method not evidenced

Safeguards

Safeguards claims inconsistent across docs

Double-claim

Not CORSIA; CCP status unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-07 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti