Vai al contenuto principale
VCS Energy demand India Registry: Registered Documentazione completa General Methodology v2.0

Distribution of Improved cook stove - Phase 19

VCS-2448 ↗

6.5 / 10
Integrity
6.2
Transparency
6.8
Claim Safety
5.8
Documentation
7.6

Score Breakdown

Integrity

verified The monitoring/verification record shows additionality confirmed by the VVB and no material findings or corrective actions reported.

missing Baseline approach and key quantifications (leakage deduction and usage rates) were not found in the extracted record, limiting confidence in ER robustness.

Transparency

verified VVB is identified (TÜV SÜD South Asia Pvt Ltd) and the monitoring period is clearly stated (2012-10-02—2017-10-01) in the monitoring report.

missing Total ERs claimed were not found in the extracted record, preventing a claimed-versus-verified cross-check.

Claim Safety

verified The monitoring report indicates leakage was treated as quantified and provides an fNRB value of 87.9, which supports a structured emissions accounting approach.

missing CORSIA eligibility and CCP status were not found in the extracted record, and missing usage-rate parameters elevate greenwashing/over-crediting risk.

Documentation

verified Multiple document types are evidenced (PDD, validation report, monitoring report, issuance) with high extraction confidence across 11 documents.

missing A core project parameter (crediting period) is inconsistent between the PDD and monitoring report, reducing reliability.

Detailed Analysis

Integrity

The monitoring report (2022-11-10) indicates additionality was confirmed by the VVB and reports no material findings and no corrective actions, which supports procedural integrity. For cookstoves, integrity depends heavily on baseline definition, leakage treatment, and demonstrated usage; the baseline method and leakage deduction percentage were not found in the extracted record, and neither assumed nor verified usage rates were found despite an annual survey being referenced in the monitoring report. Permanence/reversal risk is generally low for energy-demand projects, and no reversals were reported in the extracted record.

Transparency

The monitoring period is clearly specified as 2012-10-02 to 2017-10-01 in the monitoring report (2022-11-10), and the VVB is named (TÜV SÜD South Asia Pvt Ltd). The verified ER total is provided (60,086), but the claimed ER total was not found in the extracted record, limiting transparency on the verification delta. Key MRV parameters commonly disclosed for cookstoves (usage-rate assumptions and verified usage) were also not found in the extracted record, reducing auditability.

Claim Safety

Over-crediting risk is moderated by the presence of VVB involvement and a stated usage monitoring approach (annual survey) in the monitoring report (2022-11-10). However, the absence of extracted usage-rate values (assumed and verified) and the missing leakage deduction percentage make it difficult to judge whether credits are conservatively quantified. CORSIA eligibility and CCP status were not found in the extracted record, so downstream claim constraints cannot be confirmed from the available extraction.

Documentation

The evidence set includes the PDD, validation report, monitoring report, and issuance records, with 11 documents used and high extraction confidence, which supports documentation completeness. Safeguards are comparatively well covered in the extracted record (FPIC conducted, grievance mechanism present, and benefit sharing described). A notable weakness is an internal inconsistency in the crediting period between the PDD (2021-01-28) and the monitoring report (2022-11-10), which reduces confidence in document consistency.

Overall

Overall quality is moderate: VVB-confirmed additionality and the absence of material findings/corrective actions support credibility, and safeguards appear comparatively strong. The main constraint is quantification transparency for cookstove performance (missing usage-rate values and leakage deduction percentage in the extracted record), which elevates over-crediting and claim risk. The crediting-period contradiction is material; I privilege the monitoring report’s crediting period (2012-10-02—2022-10-01) because it is more recent (2022-11-10) and typically reflects the operational/registered parameters used for issuance, but the inconsistency still warrants a downward adjustment for reliability.

Audit Analysis

This is a VCS cookstove distribution project using AMS-II.G with VVB-confirmed additionality and documented social safeguards (FPIC and a grievance mechanism). However, key quantification elements that drive credit integrity for cookstoves (baseline approach, leakage deduction, and usage-rate assumptions/results) were not found in the extracted record, and there is a documented inconsistency in the stated crediting period across documents.

Project Description

Proponent: G K Energy Marketers Pvt. Ltd Protocol categories: Energy demand Protocols: AMS-II.G. Estimated annual GHG reductions: 12900 tCO2e Region: Asia Registration date: 2023-02-06

Red Flags

  • Crediting period dates conflict between the monitoring report (2012-10-02—2022-10-01) and the PDD (2013-01-01—2022-12-31), indicating internal document inconsistency.
  • Leakage is described as “quantified,” but the actual leakage deduction percentage was not found in the extracted record.
  • Usage monitoring is described (annual survey), but neither assumed nor verified usage rates were found in the extracted record, increasing over-crediting risk for cookstoves.

Credit Vintages

Issued Retired Available
2012
10,793 0 10,793
2013
13,008 0 13,008
2014
12,467 0 12,467
2015
12,213 0 12,213
2016
11,605 0 11,605
Total 60,086 0 60,086

Cosa migliorerebbe questo punteggio

  • Disclose and extract the baseline approach and key calculation parameters (including baseline fuel consumption and stove efficiency assumptions) from the PDD/monitoring report to enable independent ER reconstruction.
  • Report the quantified leakage deduction percentage and provide the assumed and verified usage rates (with survey design, sample size, and results) for the monitored period, and reconcile the crediting-period dates across the PDD and monitoring report.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

Energy-demand project; no reversals indicated

Leakage

Quantified in narrative, but deduction not evidenced

Baseline

Baseline approach not evidenced

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA/CCP status not evidenced

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-07 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti