Vai al contenuto principale
VCS Energy demand India Registry: Registered Documentazione completa General Methodology v2.0

Distribution of Improved cook stove - Phase 20

VCS-2440 ↗

6.0 / 10
Integrity
5.6
Transparency
6.2
Claim Safety
5.4
Documentation
7.4

Score Breakdown

Integrity

verified Additionality is confirmed by the VVB (monitoring report, 2022-08-16).

missing Baseline method and leakage deduction are not found in the extracted record, increasing over-crediting risk (monitoring report, 2022-08-16).

Transparency

verified Clear monitoring period and VVB identity are provided, and verified ERs are stated as 61,485 tCO2e (monitoring report, 2022-08-16).

missing Claimed ERs, baseline method, and usage-rate quantification are not found in the extracted record, limiting MRV transparency (monitoring report, 2022-08-16).

Claim Safety

verified The project is explicitly not CORSIA-eligible, reducing aviation-claim channel risk (monitoring report, 2022-08-16).

missing fNRB is high (87.9) but the method used is not stated in the extracted record, and usage/leakage quantification is missing, elevating over-crediting/greenwashing risk.

Documentation

verified Multiple document types are available (PDD, validation, monitoring, issuance) and extraction confidence is high (document set, 12 docs).

missing Multiple cross-document contradictions (safeguards/FPIC/grievance/benefit-sharing and crediting period dates) reduce reliability.

Detailed Analysis

Integrity

The monitoring report (2022-08-16) indicates additionality was confirmed by the VVB, which supports additionality robustness. However, the baseline approach is not stated in the extracted record, and the leakage deduction percentage is also not found even though leakage is described as quantified (monitoring report, 2022-08-16). No material findings or corrective actions are reported, which is positive for process quality but does not substitute for missing core quantifications.

Transparency

The monitoring report (2022-08-16) provides a defined monitoring period (2012-10-07 to 2017-10-06), names the VVB (TÜV SÜD South Asia Pvt Ltd), and reports verified emission reductions of 61,485 tCO2e. Transparency is weakened because the extracted record does not include total claimed ERs, the baseline method, or any numeric usage-rate assumptions/verification values, despite stating annual survey-based usage monitoring (monitoring report, 2022-08-16).

Claim Safety

The project is stated as not CORSIA-eligible (monitoring report, 2022-08-16), which lowers the risk of higher-stakes aviation claims. Over-crediting risk remains moderate because the extracted record lacks the baseline method, the leakage deduction percentage, and quantified usage-rate results, all of which are central to cookstove credit integrity. The fNRB value is reported as 87.9, but the method used to derive it is not found in the extracted record, limiting confidence in this key parameter.

Documentation

The evidence set includes a PDD, validation report, monitoring report, and issuance record, with 12 documents used and high extraction confidence, supporting a relatively strong documentation score. However, contradictions between the validation report (2022-05-23) and monitoring report (2022-08-16) on safeguards, grievance mechanism, benefit sharing, and FPIC indicate inconsistent reporting across official documents. These inconsistencies reduce confidence in the completeness and reliability of non-carbon and safeguards documentation.

Overall

I privileged the monitoring report (2022-08-16) over the validation report (2022-05-23) for safeguards/FPIC/grievance/benefit-sharing because it is later and should reflect implemented practices during/after monitoring, but the contradiction itself still signals reliability risk and lowers scores. For the crediting period discrepancy, I treat the monitoring report’s dates as operationally relevant for the monitored issuance context, but note that the PDD (2021-01-16) conflict suggests administrative/date-control weaknesses. Overall, the project benefits from VVB-confirmed additionality and a clear verified ER figure, but missing baseline/leakage/usage quantifications and multiple contradictions keep integrity and claim safety in the mid range.

Audit Analysis

This VCS cookstove project has VVB-confirmed additionality and a quantified approach to leakage is referenced, but several core quantifications (baseline approach, leakage deduction, and usage rates) are not present in the extracted record. Safeguards-related statements also conflict between the validation and monitoring documents, which reduces confidence in non-carbon claims and overall data reliability.

Project Description

Proponent: G K Energy Marketers Pvt. Ltd Protocol categories: Energy demand Protocols: AMS-II.G. Estimated annual GHG reductions: 12855 tCO2e Region: Asia Registration date: 2022-12-08

Red Flags

  • Baseline approach is not stated in the extracted record, limiting confidence in the counterfactual and over-crediting risk controls.
  • Leakage is described as quantified, but the actual leakage deduction percentage is not found in the extracted record.
  • Key cookstove driver (stove usage) is not quantified in the extracted record (no assumed or verified usage rate values).
  • Safeguards/FPIC/grievance/benefit-sharing are contradicted between the validation report and monitoring report.

Credit Vintages

Issued Retired Available
2012
10,929 226 10,703
2013
13,394 0 13,394
2014
12,758 12,758 0
2015
12,508 0 12,508
2016
11,896 0 11,896
Total 61,485 12,984 48,501

Cosa migliorerebbe questo punteggio

  • Disclose the baseline approach and parameters used (including any reassessment timing) in the public documentation set for this monitoring period.
  • Publish the numeric leakage deduction applied and the underlying calculation/justification, consistent with the statement that leakage was quantified.
  • Report quantified stove usage results (assumed and verified usage rates) from the annual surveys and show how they feed into ER calculations.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

Non-removal; no reversal risk indicated

Leakage

Quantified stated, deduction not shown

Baseline

Baseline method not evidenced here

Safeguards

Safeguards/FPIC contradicted across docs

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-07 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti