Vai al contenuto principale
VCS Energy demand India Registry: Registered Documentazione completa General Methodology v2.0

Distribution of Improved cook stove - Phase 22

VCS-2441 ↗

6.0 / 10
Integrity
5.6
Transparency
6.4
Claim Safety
5.4
Documentation
7.6

Score Breakdown

Integrity

verified Additionality is confirmed by the VVB (validation/verification documentation referenced in the extracted record).

missing Baseline method and leakage deduction value are not stated in the extracted record, weakening confidence in quantified emission reductions.

Transparency

verified Monitoring period is clearly stated (2012-10-08 to 2017-10-07) and a verified ER total is provided (60,865).

missing Claimed ERs, usage-rate metrics, and key calculation parameters are not stated in the extracted record, limiting reproducibility.

Claim Safety

verified fNRB is explicitly quantified at 87.9% and described as calculated using secondary sources.

missing CORSIA and CCP status are not stated in the extracted record, and missing baseline/leakage/usage details elevate over-crediting and claims risk.

Documentation

verified Multiple document types are evidenced (PDD, validation report, monitoring report, issuance) with high extraction confidence and 12 documents used.

missing A crediting-period contradiction between the PDD and monitoring report indicates documentation inconsistency.

Detailed Analysis

Integrity

The extracted record indicates additionality was confirmed by the VVB (validation/verification documentation referenced) and reports no material findings or corrective actions. However, the baseline method and the timing of any baseline reassessment are not stated in the extracted record, which is a major integrity gap for a cookstove ER calculation. Leakage is described as quantified in the monitoring report (2023), but the actual leakage deduction percentage is not stated in the extracted record, reducing confidence that leakage was conservatively applied.

Transparency

The monitoring report (2023-12-11) clearly states the monitoring period (2012-10-08 to 2017-10-07) and provides total verified emission reductions of 60,865. The project also discloses the monitoring approach as annual surveys in the extracted record. But the total claimed ERs, usage-rate assumed, and usage-rate verified are not stated in the extracted record, making it difficult to independently reconcile how the verified total was derived.

Claim Safety

The monitoring report (2023) provides an fNRB value of 87.9% and notes it was calculated using secondary sources, which can be acceptable but is sensitive to assumptions and national default comparisons that are not provided in the extracted record. Missing baseline method, leakage deduction percentage, and usage-rate metrics increase the risk of over-crediting and therefore the risk of unsafe claims. CORSIA eligibility and CCP status are not stated in the extracted record, so buyers cannot easily assess eligibility-based claim constraints from the extracted data alone.

Documentation

The evidence set is relatively strong: the extracted record lists a PDD, validation report, monitoring report, and issuance, with 12 documents used and high extraction confidence. The monitoring report is recent (2023-12-11) relative to the monitoring period and crediting period. However, an internal inconsistency on the crediting-period dates between core documents reduces documentation reliability.

Overall

Overall scoring is pulled down mainly by missing integrity-critical parameters (baseline method, leakage deduction percentage, and usage-rate assumed/verified) despite otherwise decent document coverage and VVB involvement. The key contradiction is the crediting period: the monitoring report (2023-12-11) states 2012-10-08 to 2022-10-07, while the PDD (2021-01-15) states 2012-12-31 to 2022-12-30. I privilege the monitoring report dates because it is more recent and typically reflects the implemented/registered crediting timeline used for issuance, but the discrepancy still indicates data reliability issues and warrants a score penalty.

Audit Analysis

This is a VCS cookstove distribution project with VVB involvement and a quantified leakage approach, and the extracted record shows no material findings or corrective actions. However, key integrity-critical parameters (baseline approach, leakage deduction value, and usage-rate assumptions/verification) are not stated in the extracted record, increasing over-crediting risk. A crediting-period date discrepancy between the PDD and monitoring report also reduces confidence in data consistency.

Project Description

Proponent: G K Energy Marketers Pvt. Ltd Protocol categories: Energy demand Protocols: AMS-II.G. Estimated annual GHG reductions: 12766 tCO2e Region: Asia Registration date: 2024-01-13

Red Flags

  • Baseline approach and reassessment timing are not stated in the extracted record, limiting confidence in the counterfactual and over-crediting controls.
  • Leakage is described as quantified but the actual leakage deduction percentage is not stated in the extracted record.
  • Usage-rate assumed and usage-rate verified are not stated in the extracted record despite reliance on annual surveys for monitoring.
  • Crediting period dates conflict between the PDD (2021) and monitoring report (2023), indicating document inconsistency.

Credit Vintages

Issued Retired Available
2012
10,836 0 10,836
2013
13,087 0 13,087
2014
12,706 0 12,706
2015
12,359 0 12,359
2016
11,877 0 11,877
Total 60,865 0 60,865

Cosa migliorerebbe questo punteggio

  • Disclose the baseline approach used under AMS II-G (including key parameters and any reassessment) and provide a clear calculation trail from activity data to the 60,865 verified ERs.
  • Report the leakage deduction percentage and its quantified basis, and publish usage-rate assumed vs. usage-rate verified results from the annual surveys (including sample design and uncertainty).

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

Non-reversal project type

Leakage

Quantified but deduction not shown

Baseline

Baseline method not evidenced

Safeguards

Safeguards mentioned; FPIC unclear

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-07 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti