Vai al contenuto principale
VCS Energy demand India Registry: Registered Documentazione completa General Methodology v2.0

Distribution of Improved cook stove - Phase I

VCS-2422 ↗

6.0 / 10
Integrity
5.6
Transparency
6.2
Claim Safety
5.4
Documentation
7.4

Score Breakdown

Integrity

verified Additionality is confirmed by the VVB (monitoring report, 2022-07-25).

missing Baseline approach and leakage deduction are not found in the extracted record, weakening over-crediting controls.

Transparency

verified VVB is identified (TÜV SÜD South Asia Pvt Ltd) and the monitoring period is clearly stated (monitoring report, 2022-07-25).

missing Key quantitative MRV fields (claimed ERs, usage rates, leakage deduction) are not found in the extracted record.

Claim Safety

verified The project is marked as not CORSIA-eligible, reducing cross-program claim risk (extracted record).

missing Over-crediting risk remains elevated because baseline and usage-performance evidence is not found in the extracted record.

Documentation

verified Multiple document types are available (PDD, validation report, monitoring report, issuance) with high extraction confidence.

missing Contradictions across core disclosures (safeguards and crediting period) reduce confidence in document consistency.

Detailed Analysis

Integrity

The monitoring report (2022-07-25) indicates additionality was confirmed by the VVB and reports no material findings or corrective actions, which supports procedural integrity. However, the baseline approach is not stated in the extracted record, and leakage is only described as “quantified” without the actual leakage deduction percentage, limiting confidence that credited reductions are conservative. Usage is said to be monitored via annual surveys (monitoring report, 2022-07-25), but no assumed or verified usage-rate values are found in the extracted record, which is a key driver of cookstove ER integrity.

Transparency

The monitoring period (2012-10-26 to 2017-10-25) and VVB name (TÜV SÜD South Asia Pvt Ltd) are clearly identified in the monitoring report (2022-07-25), and total verified ERs are provided (60,955). Transparency is weakened because total claimed ERs are not found in the extracted record, preventing a clear claimed-versus-verified comparison. Several critical quantification inputs (baseline method, leakage deduction percentage, and usage-rate values) are also not found in the extracted record.

Claim Safety

The project is indicated as not CORSIA-eligible, which lowers the risk of CORSIA-related double-claim narratives based on eligibility status. CCP status is not found in the extracted record, leaving uncertainty about broader integrity labeling. Claim safety is constrained by missing baseline and usage-rate evidence in the extracted record, which increases perceived over-crediting/greenwashing risk for cookstove demand-reduction credits.

Documentation

The extracted record shows a relatively strong document set (PDD, validation report, monitoring report, issuance) and a high extraction confidence, supporting completeness. Still, contradictions between the validation report (2022-01-28) and monitoring report (2022-07-25) on safeguards, grievance mechanism, benefit sharing, and FPIC suggest inconsistent disclosure across official documents. The crediting period is also inconsistent between the PDD (2021-01-16) and monitoring report (2022-07-25), which undermines document coherence.

Overall

Overall scoring is pulled down mainly by missing or unspecified quantification elements (baseline approach, leakage deduction percentage, and usage-rate values) that are central to cookstove credit integrity and claim safety. For contradictions, I privilege the more recent monitoring report (2022-07-25) over the validation report (2022-01-28) for safeguards/FPIC/grievance/benefit-sharing because it is later in time and typically reflects implemented practices, but the inconsistency itself still reduces confidence. For the crediting period discrepancy, I treat the PDD (2021-01-16) as the higher-authority design document for the formal crediting-period definition, while noting the monitoring report’s differing dates as a reliability issue that warrants clarification.

Audit Analysis

This VCS cookstove project has some core integrity strengths (VVB-confirmed additionality and no reported material findings), but key quantitative elements that drive crediting robustness (baseline approach, leakage deduction, and usage performance) are not clearly evidenced in the extracted record. Safeguards and stakeholder provisions appear in the monitoring report but are contradicted by the validation report, which raises reliability and greenwashing-risk concerns.

Project Description

Proponent: G K Energy Marketers Pvt. Ltd Protocol categories: Energy demand Protocols: AMS-II.G. Estimated annual GHG reductions: 12644 tCO2e Region: Asia Registration date: 2022-12-07

Red Flags

  • Baseline approach is not stated in the extracted record, limiting confidence that the counterfactual is conservative.
  • Leakage is described as quantified, but the actual leakage deduction percentage is not found in the extracted record.
  • No assumed vs verified usage-rate values are found, despite annual survey monitoring being referenced.
  • Safeguards/FPIC/grievance/benefit-sharing are contradicted between the validation report (absent) and monitoring report (present).
  • Crediting period dates conflict between the PDD and the monitoring report.

Credit Vintages

Issued Retired Available
2012
12,826 10,280 2,546
2013
12,272 0 12,272
2014
12,214 0 12,214
2015
11,890 0 11,890
2016
11,753 0 11,753
Total 60,955 10,280 50,675

Cosa migliorerebbe questo punteggio

  • Disclose and reconcile the baseline approach used (including key parameters and any reassessment timing) across the PDD, validation, and monitoring documents.
  • Provide the explicit leakage deduction percentage and calculation, and publish assumed vs verified usage-rate results from the annual surveys for the monitoring period.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

Non-reversal project type

Leakage

Quantified but deduction not evidenced

Baseline

Baseline method not evidenced

Safeguards

Safeguards claimed but inconsistent

Double-claim

Not CORSIA-eligible; CCP unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-07 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti