Skip to main content
CarbonMeld CarbonMeld Carbon Observatory
Tools
EN

Registry document

180130_Musi_1st CP_3rd ver_Monitoring Report_v2.0_lsa

Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
210 MW Musi Hydro Power Plant, Bengkulu (VCS-487)
Document type
Monitoring Report
Registry
Verra
Retrieved from the registry
File
180130_Musi_1st CP_3rd ver_Monitoring Report_v2.0_lsa.pdf

Open the PDFRegistry record of the project ↗

AnalysisScore 6.5/10Scored

See CarbonMeld's analysis of this project →