Registry document
Monitoring report for First Verification period 16.06.2021 Final
Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- Energy Efficiency measures in DMRC - Phase III elevated stations (GS-830)
- Document type
- Verification Report
- Registry
- Gold Standard
- Retrieved from the registry
- File
- Monitoring report for First Verification period 16.06.2021 Final.pdf
Open the PDFRegistry record of the project ↗
AnalysisRe-assessment pending
See CarbonMeld's analysis of this project →Cite this document
Gold Standard. Monitoring report for First Verification period 16.06.2021 Final (Verification Report), Energy Efficiency measures in DMRC - Phase III elevated stations (GS-830). CarbonMeld copy, retrieved from the registry on 20 Apr 2026: https://carbonmeld.com/projects/docs/energy-efficiency-measures-in-dmrc-phase-iii-elevated-statio-f15b7c/e9978f62a5d21b2b/.
Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.
