Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

Registry document

VERIF_REP_713_17NOV2009_31OCT2011

Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
Koyulhisar Hydro Electricity Power Plant (VCS-713)
Document type
Verification Report
Registry
Verra
Retrieved from the registry
File
VERIF_REP_713_17NOV2009_31OCT2011.pdf

Open the PDFRegistry record of the project ↗

AnalysisDocument-based rating 3.6/10Re-assessment pending

See CarbonMeld's analysis of this project →

Cite this document

Verra. VERIF_REP_713_17NOV2009_31OCT2011 (Verification Report), Koyulhisar Hydro Electricity Power Plant (VCS-713). CarbonMeld copy, retrieved from the registry on 3 Sep 2026: https://carbonmeld.com/projects/docs/koyulhisar-hydro-electricity-power-plant-739179/9b3cccb3e23997cb/.