Dongyuan Xiantang Landfill Gas Power Generation Phase I Project

VCS-3308 ↗

#83of 189 in Methane#719of 1084 in China#840of 1339 in Verra (VCS)#78of 159 in ACM0001

4.8/ 10
Integrity
3.0
Transparency
5.5
Claim Safety
6.0
Documentation
5.5

Audit Analysis

A VCS landfill gas power generation project in China with a VVB-confirmed combined additionality test and measured baseline, but undermined by multiple material calculation errors (incorrect BEEC/PEEC equations, outdated grid emission factor, wrong FCH4,BL,y case) that required corrective action. The verified emission reduction (56,564 tCO2e) is substantially below the pro-rata ex-ante expectation (~125,900 tCO2e for the 13-month monitoring period), indicating conservative crediting but also questions about the robustness of the original ex-ante estimate. The legally required capture of landfill gas in China weakens the additionality claim despite VVB confirmation.

Red Flags

  • Seven material findings in the verification report, including incorrect BEEC,y and PEEC,y equations not aligned with CDM TOOL05, use of outdated 2015-2017 grid emission factor data instead of the 2019 factor, and incorrect FCH4,BL,y case determination (case 1 instead of case 2)
  • Capture of landfill gas is legally required in China per the verification report, which fundamentally undermines the additionality claim even though the VVB confirmed a combined test
  • Verified emission reduction (56,564 tCO2e) is only ~45% of the pro-rata ex-ante expectation (~125,900 tCO2e) for the 13-month monitoring period, suggesting the lifetime ex-ante estimate of 697,121 tCO2e may be significantly overstated
  • Gas capture legally mandated — additionality in doubt

Credit Vintages

IssuedRetiredAvailable
2022
50,0006,36243,638
Total50,0006,36243,638

Risk Indicators

Additionality

VVB-confirmed but legally required capture

Permanence

LFG consumed, no reversal risk

Leakage

0% deduction, quantified justification

Baseline

Project-specific, measured, not yet due for reassessment

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents