Score Breakdown
Integrity
verified The verification report (2022-02-25) reports no material findings and no corrective actions required.
missing Additionality, baseline approach, and leakage treatment are not stated in the extracted record, limiting confidence in the credited removals.
Transparency
verified The VVB is identified (EnergyLink Services Pty Ltd) and the monitoring period is specified (2020-07-01 to 2021-12-31).
missing Key MRV/registry fields (verified removals, claimed removals, leakage deduction, and monitoring approach for biochar use) are not stated in the extracted record.
Claim Safety
verified The project is under a named methodology (Puro.earth Biochar Methodology v2.2), which can reduce discretion if applied rigorously.
missing CORSIA/CCP status and core quantification inputs (baseline and leakage) are not stated in the extracted record, elevating greenwashing and over-crediting risk.
Documentation
verified A dated verification report is present (2022-02-25) and extraction confidence is medium across 3 documents.
missing The evidence document list is not specific (listed as "unknown"), and several critical fields are missing from the extracted record.
Detailed Analysis
Integrity
The project is presented as a biochar removal activity under the Puro.earth Biochar Methodology v2.2, but the extracted record does not state the additionality test used or whether additionality was confirmed by the VVB. The verification report (2022-02-25) reports no material findings and no corrective actions required, which is a positive signal for conformance to stated requirements. However, baseline method, leakage deduction/justification, and any reassessment timing are not stated in the extracted record, which materially limits confidence in the robustness of credited removals. A 5% buffer is stated, but reversal events and their treatment are not stated in the extracted record.
Transparency
Transparency is mixed: the verification report (2022-02-25) identifies the VVB (EnergyLink Services Pty Ltd) and the monitoring period is clearly specified (2020-07-01 to 2021-12-31). At the same time, the extracted record does not include claimed versus verified total removals, nor does it include the monitoring approach for biochar use or any leakage accounting, reducing the ability for third parties to reproduce or sanity-check results. The registry is listed as "other" and the evidence document references are non-specific ("unknown"), which further limits traceability.
Claim Safety
Claims risk is elevated because key determinants of over-crediting are not stated in the extracted record: baseline method, leakage treatment, and any usage monitoring method for the biochar. CORSIA eligibility and CCP status are also not stated in the extracted record, so buyers cannot easily position the credits against higher-integrity eligibility screens. While the project sits under a defined methodology (Puro.earth Biochar Methodology v2.2), the absence of extracted quantitative results (claimed/verified removals) and core assumptions increases greenwashing risk if strong claims are made.
Documentation
Documentation appears partially complete: there is a dated verification report (2022-02-25), no material findings, and no corrective actions required, and the minimum extraction confidence is medium across 3 documents. However, the extracted record lacks many critical fields (additionality, baseline, leakage, usage monitoring, safeguards/FPIC/grievance), and the evidence document list is not identifiable beyond "unknown". These gaps reduce confidence that the full set of supporting materials is available and reviewable.
Overall
No contradictions were identified in the extracted record, so scores are driven primarily by evidence gaps rather than conflicting data. The verification report (2022-02-25) with no material findings supports a moderate documentation and process-quality view, but the absence of extracted information on additionality, baseline, leakage, and biochar usage monitoring materially weakens integrity and claim safety. If documentation were to score below 3.0, transparency would be capped by the gate rule; and if integrity were below 4.0, overall would be capped at 6.0—both are relevant sensitivities given the current missing data.
Audit Analysis
This Puro.earth biochar removal project has some structural integrity features (a stated 5% buffer and a third-party verification report with no material findings), but key quality determinants are missing from the extracted record. In particular, additionality, baseline approach, leakage treatment, and durability/usage monitoring details are not stated in the available extracted documents, increasing over-crediting and claims risk.
Project Description
Every log that goes through the mill is fully utilized, whether it is a unit of high-quality studs, chips, sawdust, hog fuel, or shavings. The sawmill has biomass-fired a co-generation boiler that runs 24/7 producing steam for use in manufacturing lumber-based products and electricity generation. Biochar is a by-product of steam production. The boiler is fed with bark from the company’s own lumber operations and additional bark and wood waste are sourced from the local region. During 1st January 2020– 31st October 2021, the company produced and shipped 4414 dry metric tons of biochar, which represent 10.8% of the total captured energy output of the boiler. The char is shipped to nearby farmers, who use it as a soil amendment.
Red Flags
- Additionality approach and whether it was confirmed by the VVB are not stated in the extracted record.
- Baseline method and any reassessment timing are not stated in the extracted record.
- Leakage deduction and justification are not stated in the extracted record.
- No extracted information on biochar use/monitoring (e.g., application tracking or durability-related controls), increasing uncertainty for removal claims.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 12,448 | 12,448 | 0 | |
| 2023 | 342 | 342 | 0 | |
| Total | 12,790 | 12,790 | 0 |
Cosa migliorerebbe questo punteggio
- Disclose and extract the additionality demonstration (test type, key parameters) and explicit VVB confirmation from the verification report and/or PDD.
- Provide the baseline approach and leakage accounting (deduction percentage and justification), plus the biochar use/monitoring method and any durability-related controls, along with claimed vs verified removals for the monitoring period.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
Additionality not evidenced in extracted record
Buffer stated (5%) but reversal treatment not evidenced
Leakage deduction/justification not evidenced
Baseline approach not evidenced
FPIC/grievance/safeguards not evidenced
CORSIA/CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →