Skip to main content
CARImproved Forest Management - ARB ComplianceCALIFORNIA, USGeneral Methodologyv2.0

Dry Burney

CAR-1091 ↗

#28of 69 in REDD+#41of 115 in United States#7of 32 in Climate Action Reserve (CAR)

4.3/ 10
Integrity
5.8
Transparency
2.5
Claim Safety
5.0
Documentation
2.5

Audit Analysis

The Dry Burney project demonstrates strong permanence and leakage controls through a substantial buffer pool contribution and quantified deduction practices. However, significant gaps in additionality verification, baseline reassessment documentation, and MRV transparency limit overall confidence. Improved document readability and clearer reporting on verifier activities would substantially strengthen the project's credibility.

Red Flags

  • Missing additionality verification and test type details
  • Low extraction confidence and unknown document metadata
  • Project-specific baseline without recorded reassessment date

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

No assessment documented

Permanence

Buffer pool active, no reversals

Leakage

Quantified 20% deduction

Baseline

Project-specific, reassessment missing

Safeguards

Safeguards not documented

Double-claim

Eligibility status unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-05General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents