Dubai CFL Project
#7of 9 in United Arab Emirates#1029of 1459 in CDM (UNFCCC)
Audit Analysis
The Dubai CFL Project is a standardised household energy-efficiency project (AMS-II.J) with VVB-confirmed additionality, but the evidence base is thin: no monitoring reports were found, the claimed and verified ERR figures are identical (165,805 tCO₂e), and the extraction confidence across documents is low. The project-specific baseline, unquantified leakage treatment, and absence of an FNRB value leave meaningful gaps in the integrity and claim-safety picture.
Red Flags
- Total ERR claimed and verified are identical (165,805 tCO₂e), strongly suggesting the 'verified' figure is simply the ex-ante estimate rather than independently monitored data
- No monitoring reports appear in the evidence base despite a 7-year crediting period (2013–2020)
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable
- Thirteen corrective action requests (CARs) were raised during validation, reflecting initial documentation quality issues
- No FNRB method or value is stated in any available document
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Low inherent reversal risk; no reversal even
0% deduction on 'deemed negligible' basis; not quantified
Project-specific baseline; no FNRB stated; reassessment not
Safeguards mentioned; FPIC and grievance mechanism not docum
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →