Skip to main content
CarbonMeld CarbonMeld Carbon Observatory
Tools
EN
Re-assessment pendingCDMLandfill gasSouth AfricaRegistry: RegisteredACM0001

Durban Landfill-gas-to-electricity project – Mariannhill and La Mercy Landfills

Developer: Durban Solid Waste (DSW) – eThekwini municipality

CDM-0545 ↗

#249of 695 in Methane#49of 136 in South Africa#2363of 5740 in CDM (UNFCCC)#108of 294 in ACM0001

Score from methodology v2.1 (analysis of 28 Aug 2026). Re-assessment under v2.2 pending.

Assessment

CarbonMeld document-based assessment

01020304 Overall 5.4 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Re-assessment pending · v2.1

Analysis

A CDM landfill-gas-to-electricity project in South Africa with VVB-confirmed additionality and a jurisdictional baseline, but undermined by a 0% leakage deduction that the monitoring report describes as 'not addressed,' the absence of a buffer pool, and 14 material findings in the verification report. The project delivered roughly 70% of its pro-rata ex-ante expectation for the monitoring period, which is conservative, yet key verification data (verified ERR, FNRB, usage monitoring method) are missing from the available documents.

Red Flags

3 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Unlock the full analysis

On this page: the analysis of 28 Aug 2026, marked “Re-assessment pending”. Per-dimension scores, risk indicators, 3 red flags, score factors, detailed analysis, and 7 registry documents (7 analyzed).

€9+ VAT per month · card subscription, renews automatically until you cancel

Every rated project, PDF reports, API access, portfolio alerts and per-dimension scores with red-flag details in side-by-side comparisons (public-data comparison is free; fair use: 30 projects per day). Cancel any time from your account page. Crypto: $9 for one month, no automatic renewal.

Price + VAT · By subscribing or paying you accept the Terms of Use — the card subscription renews every month until you cancel; digital content, no refunds. How Premium works

Eligibility & market

Transactions in the CDM registry are discontinued as of 31 December 2026 (UNFCCC, checked 6 October 2026). This page keeps the project's record and our analysis.

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    Not published

    This registry does not publish CORSIA eligibility per project.

  • Integrity label (ICVCM CCP)

    No ICVCM information

    No CCP label and no ICVCM decision found for this project's methodology.

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: project sector

  • Paris Agreement (Article 6)

    Not published

    This registry does not publish Article 6 authorizations.

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Credit Vintages

IssuedRetiredAvailable
2013
147,2090147,209
2014
33,937033,937
2016
22,134022,134
2017
72,465072,465
2020
79,105079,105
Total354,8500354,850

Methodology versions used

The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.

  1. 2013–2014ACM0001 v15.0since replaced by v19.0

    monitoring report

    official page · verified on

    in the ICVCM CCP-approved range (GS: 15.0-19.0) · official page · verified on

    in the ICVCM CCP-approved range (VCS: 15.0-19.0) · official page · verified on

  2. 2014–2016ACM0001 v15.0since replaced by v19.0

    monitoring report

    official page · verified on

    in the ICVCM CCP-approved range (GS: 15.0-19.0) · official page · verified on

    in the ICVCM CCP-approved range (VCS: 15.0-19.0) · official page · verified on

  3. 2016–2018ACM0001 v15.0since replaced by v19.0

    monitoring report

    official page · verified on

    in the ICVCM CCP-approved range (GS: 15.0-19.0) · official page · verified on

    in the ICVCM CCP-approved range (VCS: 15.0-19.0) · official page · verified on

  4. Period not statedACM0001version not confirmed in the document text

    verification report

  • ACM0001: Active (CDM / UNFCCC) · official page · verified on

Being within an ICVCM-approved version range is information only: it does not mean these credits carry the CCP label, which the registry assigns to each issuance.

A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.

Documents on the registry

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Analysis ProvenanceACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →