Skip to main content
PURremovalAustraliaGeneral Methodologyv2.1

ECHO2 Holla-Fresh

PUR-767851 ↗

#667of 1329 in Industrial#7of 14 in Australia#47of 111 in Puro.earth (PUR)

4.8/ 10
Integrity
4.0
Transparency
5.5
Claim Safety
5.0
Documentation
5.5

Audit Analysis

The ECHO2 Holla-Fresh biochar removal project (Puro.earth, Australia) presents a standard 1,000-year permanence claim with a 2.5% buffer pool and no reported reversal events, but the extracted record lacks documented additionality testing, baseline methodology, and leakage treatment. The verified ERR of 492 tCO2e is consistent between claimed and verified figures in the most recent verification report, though an earlier 2020 report cited 672 tCO2e, suggesting a ~25% downward revision. Multiple critical integrity elements are absent from the available documentation, limiting confidence in the project's additionality and baseline robustness.

Red Flags

  • No additionality test type or VVB confirmation of additionality found in the extracted record
  • Baseline method and last reassessment date not stated in any available document
  • Leakage deduction and justification entirely absent from the extracted record
  • ERR discrepancy between the 2020 verification report (672 tCO2e) and the 2023 verification report (492 tCO2e) — a 25% reduction that warrants explanation
  • No safeguards, FPIC, or grievance mechanism documentation found

Credit Vintages Exhausted

IssuedRetiredAvailable
2020
8028020
2022
6556550
Total1,4571,4570

Risk Indicators

Additionality

No additionality test documented

Permanence

1,000-yr claim, 2

Leakage

Not addressed in available records

Baseline

Baseline method not stated

Safeguards

No safeguards or FPIC documented

Double-claim

CORSIA and CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents