EcoMakala Virunga Reforestation project
GS-1712 ↗ · current registry ID: GS5618
#22of 80 in ARR (afforestation)#5of 9 in Congo, the Democratic Republic of the#779of 1801 in Gold Standard (GS)
Audit Analysis
The EcoMakala Virunga Reforestation project has a verified additionality assessment and a 20% buffer pool, but faces significant permanence risk from ongoing M23 rebel activity that has displaced planters and caused abandonment of nurseries. The absence of a verified ERR figure, a project-specific baseline, and a 0% leakage deduction with contradictory justifications across verification reports create meaningful over-crediting and transparency concerns. Low extraction confidence across 29 documents further limits the reliability of the available evidence.
Red Flags
- Ongoing M23 rebel activity since 2021 has displaced tree planters, caused abandonment of nurseries in Rutshuru, Masisi, and Nyiragongo, and created a precarious security environment that directly threatens permanence of stored carbon
- No verified ERR figure is available in the extracted record (total_err_verified is absent), making it impossible to confirm whether claimed reductions are supported by measurement
- Leakage deduction of 0% is maintained despite a corrective action requiring the project to 'assess impact of displacement of growers outside project area for leakage,' suggesting the 0% figure may not be fully justified
- The 2023 verification report lists reversal events as 'not addressed,' while the 2025 monitoring report states 'none reported' — the verification report's silence on reversal risk is a gap given the security context
- Strata 4 and 7 were excluded from the second performance certification due to low sample size, reducing the representativeness of the monitoring
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 104 | 0 | 104 | |
| 2012 | 15,283 | 0 | 15,283 | |
| 2013 | 26,414 | 0 | 26,414 | |
| 2014 | 34,145 | 0 | 34,145 | |
| 2015 | 55,148 | 0 | 55,148 | |
| 2016 | 92,924 | 0 | 92,924 | |
| 2017 | 68,899 | 0 | 68,899 | |
| 2018 | 78,608 | 0 | 78,608 | |
| 2019 | 80,264 | 0 | 80,264 | |
| 2020 | 80,264 | 0 | 80,264 | |
| 2021 | 80,265 | 0 | 80,265 | |
| 2022 | 51,004 | 0 | 51,004 | |
| Total | 663,322 | 0 | 663,322 |
Risk Indicators
VVB-confirmed combined test
20% buffer but active security threat
0% deduction, open corrective action
Project-specific, no reassessment date
FPIC, grievance mechanism, benefit sharing
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.