Efficient and Clean Cooking for households in Nigeria
GS-3772 ↗ · current registry ID: GS11671
#90of 150 in Cookstoves#43of 79 in Nigeria#1141of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove avoidance project in Nigeria with a VVB-confirmed investment additionality test, no reversal events, and a 5% quantified leakage deduction. However, significant contradictions across documents in ERR figures, fNRB values, and crediting periods, combined with 13 corrective actions and 14 clarification items, raise material data-reliability concerns that temper confidence in the claimed emission reductions.
Red Flags
- ERR figures differ by a factor of ~2.8× across documents (358,068 in the 2025 validation report vs 1,008,534 in the 2024 monitoring report), and the two appear to refer to different crediting periods, making a clean pro-rata comparison impossible
- fNRB value changed from 0.8497 (verification report, Jan 2025) to 0.64 (validation report, Aug 2025) — a 25% reduction that materially affects the emission-reduction calculation
- 13 corrective actions and 14 clarification items remain open, including unresolved questions on double-counting prevention, carbon ownership transfer, and stove-lifetime validation
- CORSIA eligibility and CCP status are both not stated, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 20,645 | 15,960 | 4,685 | |
| 2022 | 396,603 | 311,826 | 84,777 | |
| 2023 | 172,767 | 41,241 | 131,526 | |
| Total | 590,015 | 369,027 | 220,988 |
Risk Indicators
VVB-confirmed investment test
no reversals
5% quantified deduction
Project-specific; reassessed 2025
FPIC, grievance, benefit sharing documented
CORSIA and CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →