Score Breakdown

Integrity

verified The monitoring report from TÜV SÜD South Asia Pvt. Ltd. reports no material findings and no corrective actions required.

missing Reversal events are not addressed, and no buffer pool percentage is stated in the available documents.

Transparency

verified The monitoring period is clearly stated as 2011-05-01 to 2014-04-30, and the report identifies the VVB.

missing Total emission reductions claimed and verified are not found in the extracted record, reducing auditability.

Claim Safety

verified Leakage is quantified with a 5% deduction, and the project uses a national default FNRB value of 0.807.

inferred The baseline is project-specific rather than a recent standardized reassessment, which leaves some over-crediting uncertainty.

Documentation

verified Four documents were used and extraction confidence is high, with a named VVB and a dated monitoring report.

missing The extracted record does not state the additionality verification outcome, buffer pool treatment, or the verified emission reduction totals.

Detailed Analysis

Integrity

The project shows moderate integrity because the monitoring report by TÜV SÜD South Asia Pvt. Ltd. reports no material findings and no corrective actions required. Leakage is explicitly quantified at 5%, and the project uses a national default FNRB value of 0.807, which supports the baseline and leakage treatment. However, reversal events are not addressed and no buffer pool percentage is provided, so permanence is only partially evidenced.

Transparency

Transparency is mixed. The monitoring period is clearly stated as 2011-05-01 to 2014-04-30, the VVB is named, and the usage monitoring method is described as an annual survey. But the extracted record does not include total emission reductions claimed or verified, which weakens the ability to check issuance against monitoring results.

Claim Safety

Claim safety is moderate because the project applies a quantified leakage deduction of 5% and relies on a national default FNRB value rather than an obviously aggressive custom assumption. The baseline is project-based, which is acceptable but less robust than a recently reassessed standardized baseline. With no verified emission reduction totals in the extracted facts, over-crediting risk cannot be fully ruled out.

Documentation

Documentation quality is limited but not poor: four documents were used, extraction confidence is high, and the report identifies the VVB and monitoring period. Still, the extracted record does not state whether additionality was verified by the VVB, does not provide buffer pool treatment, and does not include the claimed versus verified emission reduction figures. Those gaps reduce confidence in the completeness of the evidence set.

Overall

Overall, this is a mid-quality project with some solid monitoring evidence but notable gaps in permanence, issuance transparency, and additionality verification detail. There are no contradictions listed in the merged facts, so no document hierarchy issue needs to be resolved; the main limitation is missing evidence rather than conflicting evidence. The score is held back by the absence of verified emission reduction totals and the lack of explicit reversal/buffer treatment.

Audit Analysis

This is a reasonably documented cookstove project with a VVB-verified monitoring report, quantified leakage deduction, and no material findings reported. However, key items such as the additionality verification basis, buffer pool treatment, and reversal handling are not fully stated, which limits confidence in permanence and overall claim strength.

Project Description

Developer: Egluro Type: Energy Efficiency - Domestic Size: Small Scale Methodology: AMS-II.G. Energy Efficiency Measures in Thermal Applications of Non-Renewable Biomass Crediting period: 2011-05-01 → 2021-04-30 Estimated annual credits: 24541 tCO2e SDGs: Goal 3: Good Health and Well-Being, Goal 13: Climate Action, Goal 15: Life On Land

Red Flags

  • Additionality was based on a barrier test, but VVB confirmation is not stated in the extracted record.
  • Reversal risk is not addressed and no buffer pool percentage is provided.
  • Claimed versus verified emission reductions are not available in the extracted facts, limiting transparency on over-crediting.

Credit Vintages

Issued Retired Available
2011
1,663 0 1,663
2012
10,956 0 10,956
2013
20,267 0 20,267
2014
6,786 0 6,786
Total 39,672 0 39,672

Cosa migliorerebbe questo punteggio

  • Provide the VVB-verified additionality assessment and the full emission reduction reconciliation showing claimed versus verified units.
  • Document permanence treatment explicitly, including any buffer pool contribution, reversal monitoring, and how non-permanence risk is managed.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

Barrier test present but VVB confirmation not stated

Permanence

No buffer pool stated and reversals not addressed

Leakage

Leakage quantified with a 5% deduction

Baseline

Project-specific baseline; reassessment timing not stated

Safeguards

FPIC, grievance mechanism, and safeguards are documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti