El Panul
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using an investment test (validation/verification documentation in the extracted record).
missing Leakage was not addressed and no leakage deduction is stated in the extracted record.
Transparency
verified Claimed and verified emission reductions match (17,973 tCO2e) for the stated monitoring period in the monitoring report (2012-03-15).
missing The crediting period is inconsistent across documents, reducing clarity on what period the ERs relate to.
Claim Safety
verified The project is explicitly not CORSIA-eligible in the extracted record, reducing aviation-claim overlap risk.
missing Project-specific baseline and missing reassessment timing increase over-crediting risk.
Documentation
verified Multiple core documents are available (monitoring report, validation report, PDD) and extraction confidence is high.
missing Contradictions between documents (safeguards mention and crediting period) and the presence of multiple CARs weaken document reliability.
Detailed Analysis
Integrity
The extracted record indicates additionality was confirmed by the VVB (TÜV NORD CERT GmbH) using an investment test, which supports additionality robustness. The baseline is project-specific (monitoring report, 2012-03-15) and there is no stated timing for baseline reassessment in the extracted record, which weakens baseline credibility over time. Leakage is explicitly marked as not addressed and no leakage deduction is provided in the extracted record, which is a material integrity gap for methane avoidance projects. No material findings are reported, but several corrective action requests were raised, suggesting issues were identified that needed resolution.
Transparency
The monitoring report (2012-03-15) provides a clear monitoring period (2008-03-01 to 2009-10-05) and shows claimed ERs equal verified ERs (17,973 tCO2e), which supports MRV consistency. The VVB is identified (TÜV NORD CERT GmbH), aiding traceability. However, the extracted record contains a major inconsistency on the crediting period between the monitoring report and the validation report, reducing transparency on the scope of credited reductions. Safeguards information is also inconsistent across documents, which reduces clarity on non-carbon requirements.
Claim Safety
The project is listed as not CORSIA-eligible in the extracted record, which lowers the risk of overlapping claims in the CORSIA channel. CCP status is not found in the extracted record, leaving uncertainty for high-integrity label claims. The baseline is project-specific and baseline reassessment timing is not stated, which can elevate over-crediting risk if conditions change. Leakage is not addressed and no deduction is stated, which increases the risk that credited reductions are overstated.
Documentation
Key documents are present in the extracted record (monitoring report, validation report, and PDD), and the minimum extraction confidence is high, supporting document usability. The monitoring report is dated 2012-03-15 and covers the 2008–2009 monitoring period, indicating the documentation is not very recent relative to the project start. Multiple corrective action requests (CAR 4.1-1, 4.1-2, 4.1-5, 4.2-1) indicate documentation/control issues were identified during review. Contradictions across documents (safeguards mention and crediting period) reduce confidence in completeness and consistency.
Overall
Two contradictions materially affect confidence. First, safeguards are marked as present in the PDD (2009-09-18) but absent in the validation report (2009-09-23); for scoring, the validation report was privileged because it is the independent VVB assessment and is slightly later, so safeguards were treated as not reliably evidenced. Second, the crediting period differs sharply: the monitoring report (2012-03-15) states 2008-03-01 to 2009-10-05, while the validation report (2009-09-23) states 2009-06-15 to 2019-06-14; for the ER assessment, the monitoring report period was privileged because it is the document tied to quantified monitoring/verification for the 17,973 tCO2e, but the inconsistency still lowers transparency and claim-safety due to uncertainty about the intended crediting scope.
Audit Analysis
This VCS landfill-gas methane avoidance project has VVB-confirmed additionality and matching claimed vs verified emission reductions for the reported monitoring period. However, leakage is not addressed in the extracted record and there is a material inconsistency in the stated crediting period across documents, which increases over-crediting and reliability risk.
Project Description
The “El Panul” Landfill was opened in 1981, and nearly 2 million tons of municipal solid waste from the cities of Coquimbo, La Serena, and Paihuano have been deposited at the site since then. The landfill consists of two main areas, a closed dumpsite and an engineered sanitary landfill (which recently started operation). The landfill includes a leachate collection system, a lined leachate basin, and a passive venting system to partially collect and flare the LFG. The objective of the Project is to replace the existing ineffective passive venting system with an active gas collection system so as to destroy the LFG, thus minimizing gaseous emissions and improving overall landfill operation. Indeed, the landfill gas was previously released into the atmosphere, or partially burnt via low-efficiency combustion passive flaring systems. This scenario, which is the baseline scenario, results in important methane release into the atmosphere. The project activity, by collecting and destroying efficiently the landfill gas via a proper flaring system, results in considerable methane emission reduction.
Red Flags
- Leakage is not addressed and no leakage deduction is stated, despite methane projects often having potential upstream/downstream leakage considerations.
- Crediting period is contradictory between the monitoring report (2008–2009) and the validation report (2009–2019), creating uncertainty about the scope of credited reductions.
- Multiple corrective action requests were raised (CAR 4.1-1, 4.1-2, 4.1-5, 4.2-1), indicating MRV/control weaknesses at the time of assessment.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 7,967 | 7,967 | 0 | |
| 2009 | 10,006 | 5,903 | 4,103 | |
| Total | 17,973 | 13,870 | 4,103 |
Cosa migliorerebbe questo punteggio
- Provide explicit leakage assessment and, if applicable, a quantified leakage deduction with justification in monitoring/verification documentation.
- Resolve and publicly clarify the crediting period discrepancy (validation vs monitoring) and link issued/verified ERs to a single, consistent crediting timeline.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Reversal/buffer not evidenced
Leakage not addressed
Project-specific; reassessment not stated
Safeguards not reliably evidenced
Not CORSIA; CCP status unknown
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →