Skip to main content
CDMLandfill gasBrazilACM0001

Embralixo/Araúna - Bragança Landfill Gas Project

CDM-1179 ↗

#13of 189 in Methane#15of 211 in Brazil#228of 1459 in CDM (UNFCCC)#14of 159 in ACM0001

6.0/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
5.5
Documentation
6.5

Audit Analysis

A CDM landfill gas destruction project in Brazil with VVB-confirmed additionality and no material findings, but weakened by a project-specific baseline, inconsistent leakage documentation across the PDD and monitoring report, and several missing MRV data points (verified ERR, FNRB method, usage monitoring method). The project is a methane destruction activity with inherently low permanence risk, yet the absence of a stated buffer pool and the unresolved leakage contradiction leave moderate residual uncertainty.

Red Flags

  • Leakage treatment is inconsistent: the PDD (2017) states leakage was quantified, but the 2021 monitoring report records it as 'not addressed' with a 0% deduction — the basis for the zero deduction is unclear
  • Total verified ERR is not stated in the extracted record, preventing independent verification of claimed reductions
  • Grid emission factor differs between the validation report (0.1581 tCO2/MWh, 2017) and the monitoring report (0.2431 tCO2/MWh, 2016 grid year) — a 54% swing that materially affects the credit calculation

Credit Vintages

IssuedRetiredAvailable
2011
99,814099,814
2019
11,184011,184
2020
59,971059,971
2022
26,095026,095
Total197,0640197,064

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Destruction project, no reversals

Leakage

0% deduction, inconsistent docs

Baseline

Project-specific, mixed method

Safeguards

Mentioned but FPIC/grievance absent

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-28ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents