Enercon Wind Farms in Karnataka Bundled Project 33 MW
#212of 1935 in Renewable energy#108of 975 in India#128of 1459 in CDM (UNFCCC)#151of 1287 in ACM0002
Audit Analysis
A 33 MW CDM wind project in Karnataka, India, with VVB-confirmed additionality and a jurisdictional grid baseline. The project is fundamentally sound in design, but the monitoring reports reveal significant under-delivery relative to ex-ante estimates (up to 48.74% lower), reflecting the inherent variability of wind generation. Multiple corrective actions were required at validation, and several key transparency fields (FNRB, CORSIA eligibility, CCP status) remain unreported.
Red Flags
- Verified emission reductions were 48.74% below ex-ante PDD estimates in one monitoring period and 38.10% below in another, indicating the original capacity estimates were overly optimistic
- Grid emission factor of 0.93204 tCO2/MWh is sourced from 2006 data and has not been updated in any available document
- Crediting period in the PDD (2007–2017) differs from the period stated in the 2021 monitoring report (2010–2020), suggesting a re-registration or extension that is not clearly documented in the extracted record
- Meter calibration delays and non-conformance with the registered PDD calibration frequency were flagged as material findings
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 25,780 | 0 | 25,780 | |
| 2013 | 123,369 | 0 | 123,369 | |
| 2014 | 98,466 | 0 | 98,466 | |
| 2016 | 88,070 | 0 | 88,070 | |
| 2017 | 117,694 | 0 | 117,694 | |
| 2021 | 168,362 | 0 | 168,362 | |
| 2022 | 18,351 | 0 | 18,351 | |
| Total | 640,092 | 0 | 640,092 |
Risk Indicators
VVB-confirmed combined test
Wind energy – no reversal risk
Negligible, justified for grid-connected wind
Jurisdictional grid EF from 2006, not updated
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →