Energy Efficiency at Malvinas gas plant
#821of 1329 in Industrial#14of 24 in Peru#1094of 1459 in CDM (UNFCCC)#13of 28 in ACM0012
Audit Analysis
A CDM energy-efficiency project at a Peruvian gas plant with VVB-confirmed additionality and no outstanding corrective actions, but undermined by a high volume of validation-stage corrections (17 CARs), an initially misidentified baseline scenario, and a contradictory leakage justification between the PDD and the validation report. The absence of a verified ERR figure and low extraction confidence limit confidence in the project's actual performance record.
Red Flags
- 17 corrective action requests and 11 clarification requests were raised during validation, indicating substantial initial documentation deficiencies
- Baseline scenario was initially misidentified as W1 and corrected to W2, raising the risk that early-period credits were calculated against an incorrect reference
- Leakage justification is contradictory: the PDD (Dec 2012) states 'deemed negligible' while the validation report (Dec 2012) states 'quantified', with a 0% deduction applied
- No verified ERR figure was found in any available document, preventing any comparison against the 615,040 tCO₂e lifetime claim
- Minimum extraction confidence is rated low, meaning at least one key document was poorly readable
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
EE project, no reversal risk
0% deduction, contradictory justification
Project-specific, initially misidentified
FPIC done, grievance mechanism not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →