Energy efficiency measures at Mindspace Airoli, building nos: 1, 2, 4 and 5&6 of Serene Properties Pvt.Ltd.at Navi Mumbai
#670of 1329 in Industrial#651of 975 in India#960of 1459 in CDM (UNFCCC)#10of 15 in AMS-II.E
Audit Analysis
A CDM energy-efficiency project (AMS II.E) at Mindspace Airoli with a confirmed investment-test additionality assessment by KBS Certification Services, but significant data gaps in monitoring, permanence, and leakage documentation. A factor-of-ten discrepancy in the claimed ERR between the PDD and the validation report, combined with low extraction confidence and the absence of any verified monitoring-period data, limits confidence in the project's current credit integrity.
Red Flags
- ERR discrepancy: the PDD lists 25,490 tCO₂e while the validation report states 254,900 tCO₂e — a factor-of-ten difference that, although resolved in favour of the VVB figure, signals a data-quality weakness in the project documentation.
- No monitoring-period data, verified ERR, or usage-rate figures were found in any available document, leaving the project's actual performance unverified.
- Leakage treatment is inconsistent: the PDD describes leakage as 'quantified' while the validation report concludes it is 'deemed negligible' with a 0% deduction.
- Low extraction confidence across the document set means at least one key document was poorly readable, reducing reliability of the extracted record.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Investment test confirmed by VVB
mixed evidence / unresolved risk
0% deduction; PDD and VR disagree on treatment
Project-specific modeled baseline; no reassessment date
Safeguards mentioned but FPIC and grievance mechanism not de
CCP and CORSIA status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →