Energy Efficiency Measures at MindSpace Building No 14 at Hyderabad
#1004of 1329 in Industrial#813of 975 in India#1237of 1459 in CDM (UNFCCC)#12of 15 in AMS-II.E
Audit Analysis
A CDM energy-efficiency project in Hyderabad with a confirmed investment-test additionality and no reported reversals, but undermined by a 10× discrepancy in the claimed emission reduction between the PDD and validation report, a monitoring period that predates the crediting period, and ten material findings (all reportedly resolved) that signal weak initial documentation quality. The project-specific modeled baseline and absence of most monitoring parameters limit confidence in the claimed figures.
Red Flags
- The PDD (Dec 2014) states a total emission reduction of 4,331 tCO₂e while the validation report (Feb 2015) states 43,310 tCO₂e — a tenfold discrepancy that, even if attributable to a PDD typo, indicates a lack of internal consistency in the project documentation.
- The sole monitoring period on record (Jan–Dec 2012) predates the crediting period (Feb 2015 – Feb 2025), meaning no verified monitoring data falls within the actual crediting window.
- Ten material findings (CARs and CLs) were raised during validation, covering PDD template errors, missing EIA justification, incomplete emission-calculation inputs, and unclear BMS conformity — all reportedly resolved, but the volume signals a weak initial submission.
- The grid emission factor of 0.9373 tCO₂/MWh is drawn from 2010 data and applied in a 2015 validation, a five-year gap that may overstate or understate the true factor.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Investment test confirmed by VVB
EE avoidance project, no reversals reported
0% deduction, deemed negligible, no quantitative analysis
Project-specific modeled baseline, no reassessment data
Safeguards mentioned, benefit sharing described, but FPIC an
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →