This ICR-registered industrial energy efficiency project at NFL Vijaypur Unit II presents a plausible design with a combined additionality test and appropriate non-permanence treatment, but the available evidence is limited to a single PDD with no verification or monitoring reports. The absence of a named VVB, verified emissions figures, and a detailed leakage assessment creates significant uncertainty about actual performance and claim validity.
Red Flags
- No verification report, monitoring report, or VVB report is available — only the PDD (dated 2026-01-06) was extracted, leaving actual performance unconfirmed
- No VVB is named in the extracted record, making it impossible to confirm independent verification of additionality or emissions claims
- FPIC is explicitly recorded as not conducted, and the leakage justification is limited to 'deemed negligible' without quantification
- CORSIA and CCP eligibility status are both unstated, leaving double-claiming risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 676 | 0 | 676 | |
| 2021 | 7,963 | 0 | 7,963 | |
| 2022 | 7,963 | 0 | 7,963 | |
| 2023 | 9,398 | 0 | 9,398 | |
| 2024 | 18,936 | 0 | 18,936 | |
| 2025 | 30,908 | 0 | 30,908 | |
| 2026 | 31,493 | 0 | 31,493 | |
| 2027 | 31,493 | 0 | 31,493 | |
| 2028 | 31,493 | 0 | 31,493 | |
| 2029 | 29,885 | 0 | 29,885 | |
| 2030 | 1 | 0 | 1 | |
| Total | 200,209 | 0 | 200,209 |
Risk Indicators
Combined test in PDD, no VVB confirmation
Non-AFOLU, no reversal risk
0% deduction, thin justification
Project-specific, no reassessment date
Grievance present, FPIC not conducted
CORSIA and CCP status unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →